The Serene

Dubai SouthAl Mizan

The Serene is an off-plan project by Al Mizan in Dubai South, with 106 homes on 4 floors. DLD’s last inspection, on 26 Oct 2026, found it 28% built.

Built
28%
Handover
Q4 2026
Sales in 12 months
No sales
Homes
106

About

The Serene is a 4-floor building of 106 homes in Dubai South, entered through a high-ceilinged lobby. Homes run from studios to 3-bed flats, most of them 1-bed and 2-bed flats. Shared spaces include an outdoor cinema, temperature-controlled pools and a rooftop jogging track.

  • Outdoor cinema
  • Temperature-controlled pools
  • Rooftop jogging track

Shared facilities

  • Temperature-controlled pool
  • Kids’ pool
  • Sunken pool
  • Gym
  • Outdoor cinema
  • Party zone
  • Rooftop jogging track
  • Leisure deck

Progress

28%built
  1. Q2 2025Building started
  2. Q4 2026Planned handover
  3. Oct 2026Last inspection · 28%
  4. Q2 2027Developer’s date

Homes

106 homes by size

  • Studio8%8 homes · 411–417 sq ft · 2 layouts
  • 1 bed42%44 homes · 679–879 sq ft · 12 layouts
  • 2 beds46%49 homes · 1,015–1,786 sq ft · 14 layouts
  • 3 beds5%5 homes · 1,406–2,431 sq ft · 2 layouts

Location

Drive times

  • Downtown Dubai39min
  • Dubai Airport (DXB)45min
  • Dubai Marina27min

By car. JBR Beach, the nearest beach, is 16.4 km away.

Rated schools

  • Greenfield International SchoolInternational Baccalaureate · Very good4.2 kmaway

Getting around

  • Expo 2020Red Line6.1 kmaway
  • Al Maktoum AirportHigh-speed rail · planned7.2 kmaway
  • Al Maktoum InternationalDWC7.2 kmaway
  • Al YalayisEtihad Rail8.4 kmaway
Area guideDubai SouthFinished homesAED 1,100/sq ft1-bed rentAED 57k/yrGross yieldEstimate7.4%

Developer

  • 2 past their planned date
Escrow bank
Bank of Baroda
Legal name
Al Mizan Serene Real Estate Development DWC LLC

Also being built by Al Mizan

Al Mizan’s other projects
ProjectHandoverBuilt
The HarmonyDubai SouthQ4 2025Past planned date98%
All 2 Al Mizan projects
Questions

More questions about The Serene

Q4 2026, the planned date in DLD’s register.

It is not past its planned date. It was 28% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 1 month.

106 homes on 4 floors: 8 studios of 411–417 sq ft, 44 1-bed flats of 679–879 sq ft, 49 2-bed flats of 1,015–1,786 sq ft and 5 3-bed flats of 1,406–2,431 sq ft.

About AED 41k a year for a studio, AED 57k for a 1-bed, AED 85k for a 2-bed and AED 120k for a 3-bed in Dubai South, a gross yield of about 7.4% Estimate.

Of Al Mizan’s 2 projects on DLD’s record, 0 are finished. Of the 2 being built, 2 are past their planned date.

In Dubai South, 39 minutes by car to Downtown Dubai and 45 to Dubai Airport (DXB). Expo 2020 Metro station on the Red Line is 6.1 km away.