Skip to content

Windsor House

Dubai SouthEllington

FromAED 688kStudio · 432 sq ft

Windsor House is an off-plan project by Ellington in Dubai South, with 414 homes on 10 floors. DLD’s last inspection, on 26 Oct 2026, found it 3% built.

Built
3%
Handover
Q4 2028
Sales in 12 months
399
Homes
414

Progress

3%built
  1. Q3 2025Building started
  2. Oct 2026Last inspection · 3%
  3. Q4 2028Planned handover

Prices

Price per sq ft

1,458 AED/sq ft399 sales in 12 months

Typical price by size

Studio
AED 688k432 sq ft · 1,592 AED/sq ft · 21 sales
1 bed
AED 1.16M781 sq ft · 1,482 AED/sq ft · 173 sales
2 beds
AED 1.65M1,135 sq ft · 1,436 AED/sq ft · 171 sales
3 beds
AED 2.15M1,510 sq ft · 1,433 AED/sq ft · 34 sales

Against 66 Dubai South off-plan projects with 10 or more sales

  • Lowest750AED/sq ft
  • Windsor House1,458AED/sq ft
  • Typical1,580AED/sq ft
  • Highest2,550AED/sq ft

27th lowest of 66 · AED per sq ft in 12 months

Latest sales

Plus 4 newer sales, newest first
399 off-plan sales · Nov 2025 – Oct 2026, plus 4 newer sales · newest first
DateSizeSq ftAED/sq ftPrice
Nov 2026
19 Nov 20261 bed New7811,580AED 1.23M
16 Nov 20261 bed New7811,676AED 1.31M
16 Nov 20262 beds New1,1361,573AED 1.79M
16 Nov 20262 beds New1,1281,643AED 1.85M
Oct 2026 · 2 sales
19 Oct 20262 beds1,1271,794AED 2.02M
19 Oct 20261 bed7821,414AED 1.11M
Sep 2026 · 2 sales
30 Sep 20263 beds1,4921,375AED 2.05M
24 Sep 20262 beds1,2541,634AED 2.05M
Aug 2026 · 3 sales
26 Aug 20262 beds1,1351,373AED 1.56M
25 Aug 20261 bed7811,442AED 1.13M
4 Aug 20261 bed7811,458AED 1.14M
Jul 2026 · 4 sales
23 Jul 20261 bed7821,420AED 1.11M
23 Jul 20262 beds1,2561,493AED 1.88M
16 Jul 20261 bed7811,482AED 1.16M
9 Jul 20261 bed7821,412AED 1.1M
Jun 2026 · 5 sales
22 Jun 20263 beds1,5101,458AED 2.2M
9 Jun 20262 beds1,1271,609AED 1.81M
5 Jun 20262 beds1,1351,454AED 1.65M
5 Jun 20261 bed7811,532AED 1.2M
4 Jun 20261 bed7811,602AED 1.25M
May 2026 · 20 sales
19 May 20261 bed7811,680AED 1.31M
19 May 20263 beds1,4921,434AED 2.14M
18 May 20261 bed7811,459AED 1.14M
15 May 20262 beds1,1321,426AED 1.61M
14 May 20262 beds1,1361,451AED 1.65M
14 May 20262 beds1,1361,490AED 1.69M
14 May 20261 bed7811,408AED 1.1M
14 May 20261 bed7801,482AED 1.16M
13 May 20262 beds1,1351,576AED 1.79M
12 May 20262 beds1,1311,495AED 1.69M
11 May 20262 beds1,1351,486AED 1.69M
11 May 20262 beds1,2561,383AED 1.74M
8 May 20262 beds1,1351,378AED 1.56M
6 May 20262 beds1,1311,468AED 1.66M
6 May 20261 bed7811,584AED 1.24M
6 May 20262 beds1,1341,378AED 1.56M
5 May 20262 beds1,1321,444AED 1.63M
5 May 20261 bed7811,605AED 1.25M
4 May 20262 beds1,1361,412AED 1.6M
1 May 2026Studio4321,629AED 704k
Apr 2026 · 59 sales
30 Apr 20261 bed7801,507AED 1.18M
29 Apr 20261 bed7811,456AED 1.14M
24 Apr 20261 bed7811,412AED 1.1M
24 Apr 20262 beds1,1351,462AED 1.66M
24 Apr 2026Studio4321,555AED 672k
24 Apr 20261 bed7821,506AED 1.18M
24 Apr 20262 beds1,2561,427AED 1.79M
24 Apr 20263 beds1,4921,599AED 2.39M
23 Apr 20261 bed7811,482AED 1.16M
23 Apr 20261 bed7821,562AED 1.22M

Homes

414 homes by size

  • Studio5%20 homes · 432 sq ft · 1 layout
  • 1 bed43%180 homes · 781 sq ft · 1 layout
  • 2 beds43%178 homes · 1,136–1,256 sq ft · 2 layouts
  • 3 beds9%36 homes · 1,492–1,510 sq ft · 2 layouts

Golden Visa

10-year residence for owners of homes worth AED 2M or moreOff-plan homes can qualify.
Qualifying homes fromAED 2.13M

Location

Drive times

  • Downtown Dubai40min
  • Dubai Airport (DXB)45min
  • Dubai Marina28min

By car. JBR Beach, the nearest beach, is 16.5 km away.

Rated schools

  • Greenfield International SchoolInternational Baccalaureate · Very good4.4 kmaway

Getting around

  • Expo 2020Red Line6.4 kmaway
  • Al Maktoum AirportHigh-speed rail · planned7.5 kmaway
  • Al Maktoum InternationalDWC7.5 kmaway
  • Al YalayisEtihad Rail8.6 kmaway
Area guideDubai SouthFinished homesAED 1,100/sq ft1-bed rentAED 57k/yrGross yieldEstimate7.4%

Developer

  • 18 finished
  • 25 being built, on time
  • 7 past their planned date
  • 1 not started
Escrow bank
Sharjah Islamic Bank
Legal name
Ellington SB Development L.L.C

Also being built by Ellington

Ellington’s other projects
ProjectHandoverBuilt
The PortmanJVCQ3 2025Past planned date79%
UH West BY EllingtonJLTQ1 2026Past planned date71%
UH East BY EllingtonJLTQ1 2026Past planned date47%
The QuaysideBusiness BayQ1 2026Past planned date55%
The Waterside Villas BY EllingtonMajanQ2 2026Past planned date32%
All 51 Ellington projects
Questions

More questions about Windsor House

From AED 688k for a 432 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 1.16M, 2-bed flats sell for about AED 1.65M and 3-bed flats sell for about AED 2.15M.

Q4 2028, the planned date in DLD’s register.

It is not past its planned date. It was 3% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 2 years.

414 homes on 10 floors: 20 studios of 432 sq ft, 180 1-bed flats of 781 sq ft, 178 2-bed flats of 1,136–1,256 sq ft and 36 3-bed flats of 1,492–1,510 sq ft.

About AED 41k a year for a studio, AED 57k for a 1-bed, AED 85k for a 2-bed and AED 120k for a 3-bed in Dubai South, a gross yield of about 7.4% Estimate.

Of Ellington’s 51 projects on DLD’s record, 18 are finished. Of the 32 being built, 7 are past their planned date.

Homes worth AED 2M or more can qualify for 10 years’ residence. Here, qualifying homes start from AED 2.13M.

In Dubai South, 40 minutes by car to Downtown Dubai and 45 to Dubai Airport (DXB). Expo 2020 Metro station on the Red Line is 6.4 km away.

More nearby

How the numbers work

FromAED 688kSee it on the map