Zen Lagoons
Bu KadraSanzen
Zen Lagoons is an off-plan project by Sanzen in Bu Kadra, with 177 homes on 13 floors. DLD’s last inspection, on 26 Oct 2026, found it 0% built.
- Built
- 0%
- Handover
- Q2 2029
- Sales in 12 months
- No sales
- Homes
- 177
Progress
- Q1 2026Building started
- Oct 2026Last inspection · 0%
- Q2 2029Planned handover
Homes
177 homes by size
- 1 bed72%88 homes · 695–996 sq ft · 10 layouts
- 2 beds26%32 homes · 1,170–2,067 sq ft · 7 layouts
- 3 beds2%3 homes · 1,456–1,531 sq ft · 2 layouts
Location
Drive times
- Downtown Dubai22min
- Dubai Marina34min
By car. Mercato Beach, the nearest beach, is 8.6 km away.
Rated schools
- Hartland International School - FZUK · Very good2.4 kmaway
Getting around
- Nad Al ShebaGold Line · opens 20323.4 kmaway
- MeydanEtihad Rail · planned3.6 kmaway
- CreekGreen Line4.2 kmaway
- Al JaddafHigh-speed rail · planned4.8 kmaway
- Dubai InternationalDXB8.7 kmaway
Developer
Sanzen
- 1 being built, on time
- Escrow bank
- Not on record
- Legal name
- Zennova Realty Real Estate Development L.L.C
More questions about Zen Lagoons
Q2 2029, the planned date in DLD’s register.
It is not past its planned date. It was 0% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 3 years.
177 homes on 13 floors: 88 1-bed flats of 695–996 sq ft, 32 2-bed flats of 1,170–2,067 sq ft and 3 3-bed flats of 1,456–1,531 sq ft.
About AED 110k a year for a 2-bed in Bu Kadra.
Of Sanzen’s 1 projects on DLD’s record, 0 are finished. Of the 1 being built, none is past its planned date.
In Bu Kadra, 22 minutes by car to Downtown Dubai and 34 to Dubai Marina. Creek Metro station on the Green Line is 4.2 km away.
More nearby
Off-plan nearby
- Riverton HouseFrom AED 2.13M0% built · Planned Q4 2027
- Belmore ResidencesFrom AED 1.69M7% built · Planned Q4 2027
- Ayaan Heights IFrom AED 1.75M20% built · Planned Q1 2028
- The Waterway by Prestige OneFrom AED 2.29M15% built · Planned Q2 2027
- Chavelle by ImtiazNo sales0% built · Planned Q1 2029
- Parkway by Prestige OneFrom AED 1.57M11% built · Planned Q1 2028