Beachfront Gates 3
Dubai SouthDubai South
Beachfront Gates 3 is an off-plan project by Dubai South in Dubai South, with 244 homes on 7 floors. DLD’s last inspection, on 24 Sep 2026, found it 0% built.
- Built
- 0%
- Handover
- Q2 2029
- Sales in 12 months
- No sales
- Homes
- 244
Progress
- Sep 2026Last inspection · 0%
- Q4 2026Building started
- Q2 2029Planned handover
Homes
244 homes by size
- Studio6%14 homes · 384 sq ft · 1 layout
- 1 bed47%112 homes · 834–1,218 sq ft · 16 layouts
- 2 beds38%90 homes · 1,234–2,780 sq ft · 14 layouts
- 3 beds8%20 homes · 1,936–3,013 sq ft · 7 layouts
Location
Drive times
- Downtown Dubai39min
- Dubai Airport (DXB)44min
- Dubai Marina28min
By car.
Area guideDubai SouthFinished homesAED 1,100/sq ft1-bed rentAED 57k/yrGross yieldEstimate7.4%Developer
- 13 finished
- 15 being built, on time
- 3 past their planned date
- Escrow bank
- Not on record
- Legal name
- Dubai South Properties Dwc LLC
Also being built by Dubai South
| Project | Handover | Built |
|---|---|---|
| South LivingDubai South | Q1 2020Past planned date | 89% |
| South Bay 1Dubai South | Q1 2025Past planned date | 94% |
| South Bay 2Dubai South | Q2 2026Past planned date | 94% |
| Beachfront Gates 1Dubai South | Q4 2026Being built | 36% |
| Beachfront Gates 2Dubai South | Q4 2026Being built | 61% |
More questions about Beachfront Gates 3
Q2 2029, the planned date in DLD’s register.
It is not past its planned date. It was 0% built at DLD’s last inspection on 24 Sep 2026, with handover planned in 3 years.
244 homes on 7 floors: 14 studios of 384 sq ft, 112 1-bed flats of 834–1,218 sq ft, 90 2-bed flats of 1,234–2,780 sq ft and 20 3-bed flats of 1,936–3,013 sq ft.
About AED 41k a year for a studio, AED 57k for a 1-bed, AED 85k for a 2-bed and AED 120k for a 3-bed in Dubai South, a gross yield of about 7.4% Estimate.
Of Dubai South’s 31 projects on DLD’s record, 13 are finished. Of the 18 being built, 3 are past their planned date.
In Dubai South, 39 minutes by car to Downtown Dubai and 44 to Dubai Airport (DXB).
More nearby
Off-plan nearby
- Azizi Venice 14From AED 629k30% built · Past planned date
- Azizi Venice 6From AED 730k12% built · Planned Q4 2027
- Azizi Venice 15From AED 692k0% built · Planned Q2 2027
- Azizi Venice 7From AED 640k29% built · Past planned date
- Azizi Venice 13From AED 650k46% built · Planned Q3 2027
- Azizi Venice 12From AED 650k22% built · Planned Q3 2027