Claydon House by Ellington
Bu KadraEllington
Claydon House by Ellington is an off-plan project by Ellington in Bu Kadra, with 407 homes on 37 floors. DLD’s last inspection, on 26 Oct 2026, found it 16% built.
- Built
- 16%
- Handover
- Q4 2027
- Since launch
- No change1 bed price per sq ft
- Homes
- 407
About
Claydon House is a 37-floor building of 407 homes in Bu Kadra, in Mohammed Bin Rashid City with direct access to a lagoon. Most homes are 1-bed flats, with 2-bed flats and some 3-bed and 4-bed flats, finished in marble and stone with floor-to-ceiling windows. Residents share a rooftop pool, a cinema room and an arcade room, and many flats look towards Downtown Dubai.
- Direct lagoon access
- Rooftop pool with city views
- Cinema and arcade rooms
Shared facilities
- Rooftop pool
- Gym
- Yoga studio
- Cinema room
- Arcade room
- Kids’ play area
- Landscaped gardens
- Lobby lounge and workspace
Progress
- Q2 2024Building started
- Nov 2024 – Jan 2025Launch sales · 249
- Oct 2026Last inspection · 16%
- Q2 2027Developer’s date
- Q4 2027Planned handover
Prices
Price per sq ft
Typical price by size
- 1 bed
- AED 1.6M788 sq ft · 2,008 AED/sq ft · 27 sales
- 2 beds
- AED 2.54M1,239 sq ft · 2,019 AED/sq ft · 16 sales
- 3 beds
- Not enough sales1 sale
Against 18 Bu Kadra off-plan projects with 10 or more sales
- Lowest1,849AED/sq ft
- Claydon House by Ellington2,005AED/sq ft
- Typical2,376AED/sq ft
- Highest2,979AED/sq ft
4th lowest of 18 · AED per sq ft in 12 months
Latest sales
Plus 1 newer sale, newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Nov 2026 | ||||
| 10 Nov 2026 | 1 bed New | 841 | 2,711 | AED 2.28M |
| Oct 2026 · 5 sales | ||||
| 14 Oct 2026 | 2 beds | 1,241 | 1,973 | AED 2.45M |
| 9 Oct 2026 | 2 beds | 1,294 | 1,914 | AED 2.48M |
| 9 Oct 2026 | 2 beds | 1,231 | 1,883 | AED 2.32M |
| 7 Oct 2026 | 2 beds | 1,236 | 1,818 | AED 2.25M |
| 7 Oct 2026 | 2 beds | 1,241 | 2,095 | AED 2.6M |
| Sep 2026 · 5 sales | ||||
| 24 Sep 2026 | 2 beds | 1,236 | 2,605 | AED 3.22M |
| 23 Sep 2026 | 1 bed | 829 | 1,932 | AED 1.6M |
| 23 Sep 2026 | 1 bed | 788 | 2,223 | AED 1.75M |
| 23 Sep 2026 | 1 bed | 810 | 2,066 | AED 1.67M |
| 8 Sep 2026 | 1 bed | 768 | 1,953 | AED 1.5M |
| Aug 2026 · 3 sales | ||||
| 27 Aug 2026 | 1 bed | 788 | 2,030 | AED 1.6M |
| 26 Aug 2026 | 1 bed | 841 | 2,081 | AED 1.75M |
| 12 Aug 2026 | 1 bed | 772 | 2,180 | AED 1.68M |
| Jul 2026 · 6 sales | ||||
| 17 Jul 2026 | 1 bed | 788 | 1,943 | AED 1.53M |
| 16 Jul 2026 | 1 bed | 770 | 2,176 | AED 1.68M |
| 16 Jul 2026 | 1 bed | 768 | 1,931 | AED 1.48M |
| 16 Jul 2026 | 2 beds | 1,295 | 2,149 | AED 2.78M |
| 14 Jul 2026 | 2 beds | 1,295 | 2,160 | AED 2.8M |
| 9 Jul 2026 | 1 bed | 772 | 2,008 | AED 1.55M |
| Jun 2026 · 1 sale | ||||
| 2 Jun 2026 | 1 bed | 839 | 2,109 | AED 1.77M |
| May 2026 · 1 sale | ||||
| 4 May 2026 | 1 bed | 841 | 2,093 | AED 1.76M |
| Apr 2026 · 2 sales | ||||
| 14 Apr 2026 | 1 bed | 825 | 1,961 | AED 1.62M |
| 8 Apr 2026 | 1 bed | 768 | 1,847 | AED 1.42M |
| Feb 2026 · 2 sales | ||||
| 23 Feb 2026 | 2 beds | 1,242 | 2,046 | AED 2.54M |
| 2 Feb 2026 | 1 bed | 841 | 2,057 | AED 1.73M |
| Jan 2026 · 1 sale | ||||
| 23 Jan 2026 | 1 bed | 879 | 2,699 | AED 2.37M |
| Dec 2025 · 7 sales | ||||
| 29 Dec 2025 | 1 bed | 825 | 1,889 | AED 1.56M |
| 24 Dec 2025 | 2 beds | 1,394 | 1,866 | AED 2.6M |
| 24 Dec 2025 | 2 beds | 1,257 | 1,814 | AED 2.28M |
| 24 Dec 2025 | 2 beds | 1,231 | 1,991 | AED 2.45M |
| 24 Dec 2025 | 1 bed | 812 | 2,034 | AED 1.65M |
| 15 Dec 2025 | 1 bed | 772 | 2,001 | AED 1.54M |
| 1 Dec 2025 | 3 beds | 1,614 | 1,890 | AED 3.05M |
| Nov 2025 · 11 sales | ||||
| 28 Nov 2025 | 2 beds | 1,231 | 2,102 | AED 2.59M |
| 28 Nov 2025 | 2 beds | 1,236 | 2,569 | AED 3.17M |
| 28 Nov 2025 | 2 beds | 1,231 | 2,056 | AED 2.53M |
| 25 Nov 2025 | 1 bed | 841 | 1,842 | AED 1.55M |
| 17 Nov 2025 | 1 bed | 770 | 2,208 | AED 1.7M |
| 17 Nov 2025 | 1 bed | 799 | 1,991 | AED 1.59M |
| 17 Nov 2025 | 1 bed | 772 | 1,842 | AED 1.42M |
| 17 Nov 2025 | 1 bed | 772 | 2,002 | AED 1.55M |
| 7 Nov 2025 | 1 bed | 841 | 2,052 | AED 1.73M |
| 7 Nov 2025 | 1 bed | 788 | 1,891 | AED 1.49M |
| 3 Nov 2025 | 2 beds | 1,236 | 1,912 | AED 2.36M |
Homes
407 homes by size
- 1 bed58%235 homes · 770–877 sq ft · 7 layouts
- 2 beds32%132 homes · 1,241–1,394 sq ft · 4 layouts
- 3 beds6%26 homes · 1,614–2,814 sq ft · 5 layouts
- 4 beds3%14 homes · 2,088–3,706 sq ft · 6 layouts
Golden Visa
10-year residence for owners of homes worth AED 2M or moreOff-plan homes can qualify.Qualifying homes fromAED 2.53MLocation
Drive times
- Downtown Dubai18min
- Dubai Airport (DXB)25min
- Dubai Marina31min
By car. Mercato Beach, the nearest beach, is 8.2 km away.
Rated schools
- Hartland International School - FZUK · Very good1.7 kmaway
Getting around
- MeydanGold Line · opens 20323.0 kmaway
- MeydanEtihad Rail · planned3.0 kmaway
- CreekGreen Line4.8 kmaway
- Al JaddafHigh-speed rail · planned5.2 kmaway
- Dubai InternationalDXB9.3 kmaway
Developer
- 18 finished
- 25 being built, on time
- 7 past their planned date
- 1 not started
- Escrow bank
- Abu Dhabi Commercial Bank
- Legal name
- E L P D Developers L.L.C
Also being built by Ellington
| Project | Handover | Built |
|---|---|---|
| The PortmanJVC | Q3 2025Past planned date | 79% |
| UH West BY EllingtonJLT | Q1 2026Past planned date | 71% |
| UH East BY EllingtonJLT | Q1 2026Past planned date | 47% |
| The QuaysideBusiness Bay | Q1 2026Past planned date | 55% |
| The Waterside Villas BY EllingtonMajan | Q2 2026Past planned date | 32% |
More questions about Claydon House by Ellington
From AED 1.6M for a 788 sq ft 1-bed, the lowest typical price paid in the 12 months. 2-bed flats sell for about AED 2.54M.
Q4 2027, the planned date in DLD’s register.
It is not past its planned date. It was 16% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 13 months.
407 homes on 37 floors: 235 1-bed flats of 770–877 sq ft, 132 2-bed flats of 1,241–1,394 sq ft, 26 3-bed flats of 1,614–2,814 sq ft and 14 4+ bed flats of 2,088–3,706 sq ft.
0% for 1-bed flats, per sq ft. Against the launch sales of Nov 2024 – Jan 2025: 2-bed flats up 3%.
About AED 110k a year for a 2-bed in Bu Kadra.
Of Ellington’s 51 projects on DLD’s record, 18 are finished. Of the 32 being built, 7 are past their planned date.
Homes worth AED 2M or more can qualify for 10 years’ residence. Here, qualifying homes start from AED 2.53M.
In Bu Kadra, 18 minutes by car to Downtown Dubai and 25 to Dubai Airport (DXB). Creek Metro station on the Green Line is 4.8 km away.
More nearby
Off-plan nearby
- Wynwood Horizon by ImtiazFrom AED 2.08M10% built · Planned Q4 2028
- Al VistaNo sales6% built · Planned Q4 2027
- R Home MHFrom AED 1.56M0% built · Planned Q3 2029
- The VersoNo sales0% built · Planned Q3 2030
- Helvetia VerdeFrom AED 1.66M1% built · Planned Q4 2027
- The HighgroveFrom AED 2.01M7% built · Planned Q4 2028
Finished buildings nearby
Typical next door AED 2,226/sq ft · 1 building within a 10-minute walk