Skip to content

Cove Boulevard by Imtiaz

Dubai Land Residence ComplexImtiaz

FromAED 720kStudio · 427 sq ft

Cove Boulevard by Imtiaz is an off-plan project by Imtiaz in Dubai Land Residence Complex, with 436 homes on 16 floors. DLD’s last inspection, on 26 Oct 2026, found it 10% built.

Built
10%
Handover
Q4 2028
Since launch
Up 4%Studio price per sq ft
Homes
436

About

Cove Boulevard is a 16-floor building of 287 homes in Dubai Land Residence Complex, with offices alongside the homes. Most homes are studios, with 1-bed and 2-bed flats and a few 3-bed flats, all sold fully furnished. Residents share a rooftop infinity pool, an outdoor yoga space and a clubhouse, with direct paths to the parks.

  • Sold fully furnished
  • Rooftop infinity pool
  • Homes and offices together

Shared facilities

  • Rooftop infinity pool
  • Family pool
  • Clubhouse
  • Gym
  • Jacuzzi
  • Outdoor yoga area
  • BBQ area
  • Kids’ zone

Progress

10%built
  1. Q2 2025Building started
  2. Jun–Aug 2025Launch sales · 149
  3. Oct 2026Last inspection · 10%
  4. Q2 2028Developer’s date
  5. Q4 2028Planned handover

Prices

Price per sq ft

1,668 AED/sq ft46 sales in 12 months

Typical price by size

Studio
AED 720k427 sq ft · 33 sales
1 bed
AED 1.27M984 sq ft · 7 sales
2 beds
AED 1.71M1,409 sq ft · 6 sales

Against 72 Dubai Land Residence Complex off-plan projects with 10 or more sales

  • Lowest810AED/sq ft
  • Typical1,386AED/sq ft
  • Cove Boulevard by Imtiaz1,668AED/sq ft
  • Highest1,737AED/sq ft

4th highest of 72 · AED per sq ft in 12 months

Latest sales

Plus 1 newer sale, newest first
46 off-plan sales · Nov 2025 – Oct 2026, plus 1 newer sale · newest first
DateSizeSq ftAED/sq ftPrice
Nov 2026
13 Nov 20262 beds New1,4141,252AED 1.77M
Jul 2026 · 1 sale
13 Jul 20262 beds1,2091,250AED 1.51M
Jun 2026 · 2 sales
29 Jun 20262 beds1,4331,263AED 1.81M
4 Jun 2026Studio4631,552AED 718k
May 2026 · 2 sales
5 May 20261 bed8271,562AED 1.29M
4 May 2026Studio4631,694AED 784k
Apr 2026 · 12 sales
22 Apr 2026Studio4271,784AED 762k
22 Apr 2026Studio4631,611AED 746k
22 Apr 2026Studio4631,545AED 715k
22 Apr 2026Studio4271,670AED 713k
21 Apr 2026Studio4111,718AED 706k
15 Apr 2026Studio4111,873AED 770k
15 Apr 20262 beds1,4091,379AED 1.94M
13 Apr 2026Studio4111,768AED 727k
9 Apr 2026Studio4621,695AED 783k
9 Apr 2026Studio4631,693AED 784k
7 Apr 2026Studio4631,548AED 717k
6 Apr 20261 bed9841,376AED 1.35M
Mar 2026 · 2 sales
30 Mar 2026Studio4111,709AED 702k
13 Mar 2026Studio3971,738AED 690k
Feb 2026 · 10 sales
26 Feb 2026Studio4111,872AED 770k
25 Feb 20262 beds1,4091,376AED 1.94M
25 Feb 2026Studio4021,719AED 691k
25 Feb 2026Studio4271,667AED 712k
18 Feb 2026Studio4111,826AED 750k
18 Feb 20261 bed8261,433AED 1.18M
16 Feb 2026Studio4631,554AED 720k
9 Feb 2026Studio4111,761AED 724k
9 Feb 2026Studio4271,710AED 730k
3 Feb 2026Studio4111,872AED 770k
Jan 2026 · 5 sales
28 Jan 2026Studio4111,851AED 761k
26 Jan 2026Studio4271,801AED 769k
14 Jan 2026Studio4111,760AED 723k
8 Jan 2026Studio4111,761AED 724k
6 Jan 20261 bed8271,397AED 1.16M
Dec 2025 · 1 sale
25 Dec 2025Studio4621,540AED 711k
Nov 2025 · 11 sales
28 Nov 2025Studio4111,725AED 709k
26 Nov 2025Studio4091,692AED 692k
25 Nov 2025Studio4631,498AED 694k
24 Nov 2025Studio4111,686AED 693k
24 Nov 20251 bed9841,463AED 1.44M
21 Nov 20251 bed9841,292AED 1.27M
18 Nov 20252 beds1,4491,117AED 1.62M
18 Nov 20252 beds1,4091,109AED 1.56M
13 Nov 20251 bed9841,124AED 1.11M
13 Nov 2025Studio4271,552AED 663k
4 Nov 2025Studio4631,552AED 719k

Homes

436 homes by size

  • Studio60%172 homes · 397–463 sq ft · 5 layouts
  • 1 bed22%62 homes · 764–984 sq ft · 5 layouts
  • 2 beds17%48 homes · 1,109–1,449 sq ft · 5 layouts
  • 3 beds2%5 homes · 1,640–1,879 sq ft · 3 layouts

Option 1: 60% during construction · 40% on completion; Option 2: 70% up to completion · 30% post-handover over 3 years, quarterly

Payments go to the project’s escrow account at First Abu Dhabi Bank.

Location

Drive times

  • Downtown Dubai27min
  • Dubai Airport (DXB)26min
  • Dubai Marina35min

By car. Jumeirah Open Beach, the nearest beach, is 18.0 km away.

Rated schools

  • GEMS Wellington Academy -FzeUK · Very good2.2 kmaway
  • Repton SchoolUK/IB (Y 13) · Outstanding5.0 kmaway

Getting around

  • Dubai Silicon OasisBlue Line · opens 20292.5 kmaway
  • MeydanEtihad Rail · planned9.7 kmaway
  • CreekGreen Line14 kmaway
  • Al JaddafHigh-speed rail · planned14 kmaway
  • Dubai InternationalDXB17 kmaway
Area guideDubai Land Residence ComplexFinished homesAED 841/sq ft1-bed rentAED 56k/yrGross yieldEstimate8.4%

Developer

  • 10 finished
  • 28 being built, on time
  • 3 past their planned date
Escrow bank
First Abu Dhabi Bank
Legal name
Imtiaz Real Estate Investment & Development L.L.C

Also being built by Imtiaz

Imtiaz’s other projects
ProjectHandoverBuilt
Beach Walk Residences 3 BY ImtiazDubai IslandsQ2 2026Past planned date100%
Cove Edition Residence 1 By ImtiazDubai Land Residence ComplexQ3 2026Past planned date90%
Cove Edition Residence 2 By ImtiazDubai Land Residence ComplexQ4 2026Past planned date60%
Luxur Tower By ImtiazJVCQ4 2026Being built90%
Beach Walk Grand By ImtiazDubai IslandsQ4 2026Being built68%
All 41 Imtiaz projects
Questions

More questions about Cove Boulevard by Imtiaz

From AED 720k for a 427 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 1.27M and 2-bed flats sell for about AED 1.71M.

Q4 2028, the planned date in DLD’s register.

It is not past its planned date. It was 10% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 2 years.

436 homes on 16 floors: 172 studios of 397–463 sq ft, 62 1-bed flats of 764–984 sq ft, 48 2-bed flats of 1,109–1,449 sq ft and 5 3-bed flats of 1,640–1,879 sq ft.

Up 2% for 1-bed flats, per sq ft. Against the launch sales of Jun 2025 – Aug 2025: studios up 4%, 2-bed flats up 9%.

About AED 40k a year for a studio, AED 56k for a 1-bed, AED 73k for a 2-bed and AED 100k for a 3-bed in Dubai Land Residence Complex, a gross yield of about 8.4% Estimate.

Of Imtiaz’s 41 projects on DLD’s record, 10 are finished. Of the 31 being built, 3 are past their planned date.

In Dubai Land Residence Complex, 27 minutes by car to Downtown Dubai and 26 to Dubai Airport (DXB). Creek Metro station on the Green Line is 14 km away.

More nearby

How the numbers work

FromAED 720kSee it on the map