
Expo City Al Waha Residences 01
Expo CityExpo City Dubai
Expo City Al Waha Residences 01 is an off-plan project by Expo City Dubai in Expo City, with 284 homes on 3 floors. DLD’s last inspection, on 26 Oct 2026, found it 66% built.
- Built
- 66%
- Handover
- Q2 2027
- Since launch
- No change1 bed price per sq ft
- Homes
- 284
Progress
- Mar–May 2025Launch sales · 263
- Q2 2025Building started
- Oct 2026Last inspection · 66%
- Q2 2027Planned handover
Prices
Price per sq ft
Typical price by size
- 1 bed
- AED 1.96M785 sq ft · 4 sales
- 2 beds
- AED 3.49M1,389 sq ft · 8 sales
Against 66 Dubai South off-plan projects with 10 or more sales
- Lowest750AED/sq ft
- Typical1,580AED/sq ft
- Expo City Al Waha Residences 012,515AED/sq ft
- Highest2,550AED/sq ft
2nd highest of 66 · AED per sq ft in 12 months
Latest sales
Newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Jul 2026 · 1 sale | ||||
| 29 Jul 2026 | 2 beds | 1,593 | 2,500 | AED 3.98M |
| Jun 2026 · 3 sales | ||||
| 26 Jun 2026 | 1 bed | 785 | 2,516 | AED 1.98M |
| 26 Jun 2026 | 1 bed | 786 | 2,500 | AED 1.97M |
| 26 Jun 2026 | 1 bed | 785 | 2,502 | AED 1.96M |
| May 2026 · 1 sale | ||||
| 7 May 2026 | 1 bed | 740 | 2,501 | AED 1.85M |
| Feb 2026 · 3 sales | ||||
| 25 Feb 2026 | 2 beds | 1,443 | 2,515 | AED 3.63M |
| 9 Feb 2026 | 2 beds | 1,388 | 2,515 | AED 3.49M |
| 9 Feb 2026 | 2 beds | 1,388 | 2,515 | AED 3.49M |
| Jan 2026 · 3 sales | ||||
| 21 Jan 2026 | 2 beds | 1,389 | 2,516 | AED 3.5M |
| 21 Jan 2026 | 2 beds | 1,388 | 2,516 | AED 3.49M |
| 21 Jan 2026 | 2 beds | 1,388 | 2,516 | AED 3.49M |
| Dec 2025 · 1 sale | ||||
| 24 Dec 2025 | 2 beds | 1,540 | 2,500 | AED 3.85M |
Homes
284 homes by size
- Studio1 home · 550 sq ft · 1 layout
- 1 bed42%119 homes · 684–1,158 sq ft · 22 layouts
- 2 beds58%164 homes · 1,162–2,520 sq ft · 23 layouts
Golden Visa
10-year residence for owners of homes worth AED 2M or moreOff-plan homes can qualify.Qualifying homes fromAED 3.49MLocation
Drive times
- Downtown Dubai39min
- Dubai Airport (DXB)44min
- Dubai Marina28min
By car. Jebel Ali Beach, the nearest beach, is 13.4 km away.
Rated schools
- Greenfield International SchoolInternational Baccalaureate · Very good4.4 kmaway
Getting around
- Expo 2020Red Line9 minwalk
- Al YalayisEtihad Rail6.7 kmaway
- Al Maktoum AirportHigh-speed rail · planned7.1 kmaway
- Al Maktoum InternationalDWC7.1 kmaway
Area guideDubai SouthFinished homesAED 1,100/sq ft1-bed rentAED 57k/yrGross yieldEstimate7.4%Developer
- 6 being built, on time
- 2 past their planned date
- 1 not started
- Escrow bank
- Emirates NBD Bank
- Legal name
- Expo City AL Waha Residences Development Fzco
Also being built by Expo City Dubai
| Project | Handover | Built |
|---|---|---|
| Expo City Mangrove ResidencesDubai South | Q1 2026Past planned date | 91% |
| Expo City ValleyDubai South | Q1 2026Past planned date | 66% |
| Expo City Al Waha Residences 02Dubai South | Q2 2027Being built | 61% |
| Expo City Sidr ResidencesDubai South | Q1 2028Being built | 25% |
| Expo Valley ViewsDubai South | Q2 2029Being built | 0% |
More questions about Expo City Al Waha Residences 01
From AED 1.96M for a 785 sq ft 1-bed, the lowest typical price paid in the 12 months. 2-bed flats sell for about AED 3.49M.
Q2 2027, the planned date in DLD’s register.
It is not past its planned date. It was 66% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 7 months.
284 homes on 3 floors: 1 studio of 550 sq ft, 119 1-bed flats of 684–1,158 sq ft and 164 2-bed flats of 1,162–2,520 sq ft.
0% for 1-bed flats, per sq ft. Against the launch sales of Mar 2025 – May 2025: 2-bed flats up 1%.
About AED 41k a year for a studio, AED 57k for a 1-bed and AED 85k for a 2-bed in Dubai South, a gross yield of about 7.4% Estimate.
Of Expo City Dubai’s 9 projects on DLD’s record, 0 are finished. Of the 8 being built, 2 are past their planned date.
Homes worth AED 2M or more can qualify for 10 years’ residence. Here, qualifying homes start from AED 3.49M.
In Expo City, Dubai South, 39 minutes by car to Downtown Dubai and 44 to Dubai Airport (DXB). Expo 2020 Metro station on the Red Line is a 9-minute walk.
More nearby
Off-plan nearby
- Expo City Sky ResidencesFrom AED 1.95M53% built · Handover not on record
- Expo City Mangrove ResidencesFrom AED 1.9M91% built · Past planned date
- Expo City Al Waha Residences 02From AED 3.62M61% built · Planned Q2 2027
- Expo City Sidr ResidencesFrom AED 2.83M25% built · Planned Q1 2028
- Terra WoodsFrom AED 1.64M0% built · Planned Q1 2030
- Terra GardensFrom AED 1.58M4% built · Planned Q4 2029