Terra Woods is an off-plan project by Emaar in Expo City, with 824 homes on 12 floors. DLD’s last inspection, on 26 Oct 2026, found it 0% built.

Built
0%
Handover
Q1 2030
Sales in 12 months
495
Homes
824

Progress

0%built
  1. Q2 2026Building started
  2. Oct 2026Last inspection · 0%
  3. Q1 2030Planned handover

Prices

Price per sq ft

2,194 AED/sq ft495 sales in 12 months

Typical price by size

1 bed
AED 1.64M746 sq ft · 2,187 AED/sq ft · 308 sales
2 beds
AED 2.48M1,119 sq ft · 2,223 AED/sq ft · 175 sales
3 beds
AED 3.6M1,669 sq ft · 2,150 AED/sq ft · 12 sales

Against 66 Dubai South off-plan projects with 10 or more sales

  • Lowest750AED/sq ft
  • Typical1,580AED/sq ft
  • Terra Woods2,194AED/sq ft
  • Highest2,550AED/sq ft

4th highest of 66 · AED per sq ft in 12 months

Latest sales

Plus 22 newer sales, newest first
495 off-plan sales · Nov 2025 – Oct 2026, plus 22 newer sales · newest first
DateSizeSq ftAED/sq ftPrice
Nov 2026
18 Nov 20261 bed New8422,050AED 1.73M
17 Nov 20261 bed New7422,194AED 1.63M
17 Nov 20261 bed New7462,201AED 1.64M
17 Nov 20262 beds New1,1192,109AED 2.36M
11 Nov 20262 beds New1,1192,215AED 2.48M
10 Nov 20261 bed New8422,049AED 1.72M
9 Nov 20261 bed New7452,178AED 1.62M
9 Nov 20261 bed New7452,194AED 1.63M
9 Nov 20262 beds New1,1192,122AED 2.37M
9 Nov 20262 beds New1,1132,218AED 2.47M
9 Nov 20262 beds New1,1112,248AED 2.5M
9 Nov 20262 beds New1,1212,244AED 2.52M
5 Nov 20261 bed New7452,186AED 1.63M
5 Nov 20262 beds New1,1132,222AED 2.47M
4 Nov 20261 bed New7422,190AED 1.62M
4 Nov 20261 bed New7422,198AED 1.63M
4 Nov 20261 bed New7602,308AED 1.75M
2 Nov 20261 bed New7452,189AED 1.63M
2 Nov 20261 bed New7452,200AED 1.64M
2 Nov 20261 bed New7532,194AED 1.65M
2 Nov 20261 bed New7612,198AED 1.67M
2 Nov 20262 beds New1,1262,183AED 2.46M
Oct 2026 · 16 sales
28 Oct 20263 beds1,6692,137AED 3.57M
28 Oct 20262 beds1,1112,254AED 2.5M
28 Oct 20262 beds1,1212,253AED 2.53M
28 Oct 20261 bed7642,239AED 1.71M
28 Oct 20261 bed7652,229AED 1.7M
27 Oct 20262 beds1,1112,245AED 2.49M
26 Oct 20262 beds1,1132,222AED 2.47M
22 Oct 20261 bed7422,106AED 1.56M
20 Oct 20261 bed7532,174AED 1.64M
20 Oct 20262 beds1,1212,249AED 2.52M
20 Oct 20262 beds1,1112,249AED 2.5M
15 Oct 20262 beds1,1202,245AED 2.51M
14 Oct 20261 bed7422,264AED 1.68M
13 Oct 20261 bed7422,299AED 1.71M
13 Oct 20261 bed7532,190AED 1.65M
12 Oct 20262 beds1,1202,250AED 2.52M
Sep 2026 · 26 sales
30 Sep 20261 bed7422,172AED 1.61M
30 Sep 20262 beds1,1132,214AED 2.46M
30 Sep 20261 bed7642,245AED 1.71M
28 Sep 20262 beds1,1192,211AED 2.47M
28 Sep 20261 bed7652,163AED 1.65M
23 Sep 20261 bed7422,176AED 1.61M
23 Sep 20261 bed7602,177AED 1.65M
18 Sep 20262 beds1,1192,104AED 2.35M
17 Sep 20261 bed7662,312AED 1.77M
17 Sep 20261 bed7612,204AED 1.68M
16 Sep 20262 beds1,1192,109AED 2.36M
15 Sep 20261 bed7422,198AED 1.63M

Homes

824 homes by size

  • 1 bed56%463 homes · 742–866 sq ft · 5 layouts
  • 2 beds38%311 homes · 1,113–1,231 sq ft · 4 layouts
  • 3 beds6%50 homes · 1,678–2,702 sq ft · 3 layouts

Golden Visa

10-year residence for owners of homes worth AED 2M or moreOff-plan homes can qualify.
Qualifying homes fromAED 2.41M

Location

Drive times

  • Downtown Dubai39min
  • Dubai Airport (DXB)44min
  • Dubai Marina28min

By car. JBR Beach, the nearest beach, is 12.8 km away.

Rated schools

  • Greenfield International SchoolInternational Baccalaureate · Very good4.3 kmaway

Getting around

  • Expo 2020Red Line6 minwalk
  • Al YalayisEtihad Rail6.1 kmaway
  • Al Maktoum AirportHigh-speed rail · planned7.9 kmaway
  • Al Maktoum InternationalDWC7.9 kmaway
Area guideDubai SouthFinished homesAED 1,100/sq ft1-bed rentAED 57k/yrGross yieldEstimate7.4%

Developer

  • 193 finished
  • 139 being built, on time
  • 3 past their planned date
Escrow bank
Not on record
Legal name
Dwtc Emaar L.L.C

Also being built by Emaar

Emaar’s other projects
ProjectHandoverBuilt
MaysanTown SquareQ3 2016Past planned date37%
Teema 1 & Teema 2Al Yalayis 4Q3 2016Past planned date9%
Ocean StarDubai Maritime CityQ3 2025Past planned date30%
SeascapeDubai Maritime CityQ4 2026Being built79%
The St. Regis Residences, Downtown DubaiDowntown DubaiQ4 2026Being built76%
All 335 Emaar projects
Questions

More questions about Terra Woods

From AED 1.64M for a 746 sq ft 1-bed, the lowest typical price paid in the 12 months. 2-bed flats sell for about AED 2.48M and 3-bed flats sell for about AED 3.6M.

Q1 2030, the planned date in DLD’s register.

It is not past its planned date. It was 0% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 3 years.

824 homes on 12 floors: 463 1-bed flats of 742–866 sq ft, 311 2-bed flats of 1,113–1,231 sq ft and 50 3-bed flats of 1,678–2,702 sq ft.

About AED 57k a year for a 1-bed, AED 85k for a 2-bed and AED 120k for a 3-bed in Dubai South, a gross yield of about 7.4% Estimate.

Of Emaar’s 335 projects on DLD’s record, 193 are finished. Of the 142 being built, 3 are past their planned date.

Homes worth AED 2M or more can qualify for 10 years’ residence. Here, qualifying homes start from AED 2.41M.

In Expo City, Dubai South, 39 minutes by car to Downtown Dubai and 44 to Dubai Airport (DXB). Expo 2020 Metro station on the Red Line is a 6-minute walk.

More nearby

How the numbers work