Expo City Sky Residences
Expo CityExpo City Dubai
Expo City Sky Residences is an off-plan project by Expo City Dubai in Expo City, with 419 homes on 14 floors. DLD’s last inspection, on 26 Oct 2026, found it 53% built.
- Built
- 53%
- Handover
- Not on record
- Since launch
- Up 4%1 bed price per sq ft
- Homes
- 419
Progress
- Mar–May 2024Launch sales · 171
- Q2 2024Building started
- Oct 2026Last inspection · 53%
Prices
Price per sq ft
Typical price by size
- 1 bed
- AED 1.95M932 sq ft · 2,041 AED/sq ft · 7 sales
- 2 beds
- Not enough sales2 sales
- 3 beds
- Not enough sales1 sale
Against 66 Dubai South off-plan projects with 10 or more sales
- Lowest750AED/sq ft
- Typical1,580AED/sq ft
- Expo City Sky Residences2,011AED/sq ft
- Highest2,550AED/sq ft
8th highest of 66 · AED per sq ft in 12 months
Latest sales
Newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Sep 2026 · 2 sales | ||||
| 28 Sep 2026 | 1 bed | 810 | 1,988 | AED 1.61M |
| 24 Sep 2026 | 2 beds | 1,501 | 1,891 | AED 2.84M |
| Aug 2026 · 2 sales | ||||
| 24 Aug 2026 | 1 bed | 931 | 2,041 | AED 1.9M |
| 24 Aug 2026 | 1 bed | 934 | 2,034 | AED 1.9M |
| Jul 2026 · 1 sale | ||||
| 30 Jul 2026 | 1 bed | 932 | 2,109 | AED 1.97M |
| Jun 2026 · 1 sale | ||||
| 17 Jun 2026 | 3 beds | 2,165 | 1,951 | AED 4.22M |
| Apr 2026 · 1 sale | ||||
| 20 Apr 2026 | 1 bed | 1,102 | 2,042 | AED 2.25M |
| Jan 2026 · 1 sale | ||||
| 9 Jan 2026 | 2 beds | 1,370 | 1,858 | AED 2.55M |
| Nov 2025 · 2 sales | ||||
| 21 Nov 2025 | 1 bed | 928 | 2,101 | AED 1.95M |
| 7 Nov 2025 | 1 bed | 1,030 | 1,925 | AED 1.98M |
Homes
419 homes by size
- 1 bed45%187 homes · 810–1,102 sq ft · 8 layouts
- 2 beds42%177 homes · 1,352–1,559 sq ft · 9 layouts
- 3 beds13%54 homes · 2,069–2,215 sq ft · 3 layouts
- 4 beds1 home · 3,542 sq ft · 1 layout
Location
Drive times
- Downtown Dubai39min
- Dubai Airport (DXB)44min
- Dubai Marina28min
By car. Jebel Ali Beach, the nearest beach, is 13.6 km away.
Rated schools
- Greenfield International SchoolInternational Baccalaureate · Very good4.4 kmaway
Getting around
- Expo 2020Red Line12 minwalk
- Al YalayisEtihad Rail6.8 kmaway
- Al Maktoum AirportHigh-speed rail · planned6.9 kmaway
- Al Maktoum InternationalDWC6.9 kmaway
Area guideDubai SouthFinished homesAED 1,100/sq ft1-bed rentAED 57k/yrGross yieldEstimate7.4%Developer
- 6 being built, on time
- 2 past their planned date
- 1 not started
- Escrow bank
- Emirates NBD Bank
- Legal name
- Expo City Sky Residences Development FZCO
Also being built by Expo City Dubai
| Project | Handover | Built |
|---|---|---|
| Expo City Mangrove ResidencesDubai South | Q1 2026Past planned date | 91% |
| Expo City ValleyDubai South | Q1 2026Past planned date | 66% |
| Expo City Al Waha Residences 01Dubai South | Q2 2027Being built | 66% |
| Expo City Al Waha Residences 02Dubai South | Q2 2027Being built | 61% |
| Expo City Sidr ResidencesDubai South | Q1 2028Being built | 25% |
More questions about Expo City Sky Residences
From AED 1.95M for a 932 sq ft 1-bed, the lowest typical price paid in the 12 months.
419 homes on 14 floors: 187 1-bed flats of 810–1,102 sq ft, 177 2-bed flats of 1,352–1,559 sq ft, 54 3-bed flats of 2,069–2,215 sq ft and 1 4+ bed of 3,542 sq ft.
Up 4% for 1-bed flats, per sq ft.
About AED 57k a year for a 1-bed, AED 85k for a 2-bed and AED 120k for a 3-bed in Dubai South, a gross yield of about 7.4% Estimate.
Of Expo City Dubai’s 9 projects on DLD’s record, 0 are finished. Of the 8 being built, 2 are past their planned date.
In Expo City, Dubai South, 39 minutes by car to Downtown Dubai and 44 to Dubai Airport (DXB). Expo 2020 Metro station on the Red Line is a 12-minute walk.
More nearby
Off-plan nearby
- Expo City Al Waha Residences 01From AED 1.96M66% built · Planned Q2 2027
- Expo City Mangrove ResidencesFrom AED 1.9M91% built · Past planned date
- Expo City Sidr ResidencesFrom AED 2.83M25% built · Planned Q1 2028
- Expo City Al Waha Residences 02From AED 3.62M61% built · Planned Q2 2027
- Terra WoodsFrom AED 1.64M0% built · Planned Q1 2030
- Terra GardensFrom AED 1.58M4% built · Planned Q4 2029
