Fairway Villas 2
Dubai SouthEmaar
Fairway Villas 2 is an off-plan project by Emaar in Dubai South. DLD’s last inspection, on 26 Oct 2026, found it 92% built.
- Built
- 92%
- Handover
- Q4 2026
- Sales in 12 months
- No sales
- Homes
- Not on record
Progress
- Q3 2023Building started
- Oct 2026Last inspection · 92%
- Q4 2026Planned handover
Location
Drive times
- Downtown Dubai39min
- Dubai Airport (DXB)44min
- Dubai Marina28min
By car. Jebel Ali Beach, the nearest beach, is 18.9 km away.
Rated schools
No rated schools within 5 km
Getting around
- Al Maktoum AirportHigh-speed rail · planned4.8 kmaway
- Al Maktoum InternationalDWC4.8 kmaway
- Expo 2020Red Line12 kmaway
- Al YalayisEtihad Rail18 kmaway
Area guideDubai SouthFinished homesAED 1,100/sq ft1-bed rentAED 57k/yrGross yieldEstimate7.4%Developer
- 193 finished
- 139 being built, on time
- 3 past their planned date
- Escrow bank
- Dubai Islamic Bank
- Legal name
- Emaar Dubai South Dwc LLC
Also being built by Emaar
| Project | Handover | Built |
|---|---|---|
| MaysanTown Square | Q3 2016Past planned date | 37% |
| Teema 1 & Teema 2Al Yalayis 4 | Q3 2016Past planned date | 9% |
| Ocean StarDubai Maritime City | Q3 2025Past planned date | 30% |
| SeascapeDubai Maritime City | Q4 2026Being built | 79% |
| The St. Regis Residences, Downtown DubaiDowntown Dubai | Q4 2026Being built | 76% |
More questions about Fairway Villas 2
Q4 2026, the planned date in DLD’s register.
It is not past its planned date. It was 92% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 1 month.
About AED 41k a year for a studio, AED 57k for a 1-bed, AED 85k for a 2-bed and AED 120k for a 3-bed in Dubai South, a gross yield of about 7.4% Estimate.
Of Emaar’s 335 projects on DLD’s record, 193 are finished. Of the 142 being built, 3 are past their planned date.
In Dubai South, 39 minutes by car to Downtown Dubai and 44 to Dubai Airport (DXB). Expo 2020 Metro station on the Red Line is 12 km away.
More nearby
Off-plan nearby
- Fairway Villas 3No sales49% built · Handover not on record
- Azizi Venice 1From AED 787k67% built · Past planned date
- Azizi Venice 2From AED 694k57% built · Past planned date
- Discovery DunesNo sales70% built · Past planned date
- Azizi Venice 3From AED 641k76% built · Past planned date
- Azizi Venice 8From AED 624k53% built · Handover not on record