Jumeirah Asora Bay
La MerMeraas
Jumeirah Asora Bay is an off-plan project by Meraas in La Mer, with 29 homes on 10 floors. DLD’s last inspection, on 26 Oct 2026, found it 4% built.
- Built
- 4%
- Handover
- Q1 2029
- Sales in 12 months
- 5
- Homes
- 29
About
Homes of 4 to 7 bedrooms by the sea at La Mer in Jumeirah 1, from apartments and duplexes to a penthouse. The site climbs through planted hills to small coves along the beach. Residents share a lap pool, an infinity terrace and several gardens, with a lounge, spa and gym.
- By the sea at La Mer
- Homes of 4 to 7 bedrooms
- Lap pool, spa and gardens
Shared facilities
- Lap pool
- Infinity terrace
- Coastal garden
- Sculpture garden
- Skyline garden
- Multi-purpose room
- Residents’ lounge
- Spa and gym
Progress
- Q2 2025Building started
- May–Jul 2025Launch sales · 23
- Oct 2026Last inspection · 4%
- Q1 2029Planned handover
Prices
Price per sq ft
Typical price by size
- 4 beds
- Not enough sales2 sales
- 5 beds
- Not enough sales2 sales
- 6 beds
- Not enough sales1 sale
Latest sales
Newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Aug 2026 · 1 sale | ||||
| 5 Aug 2026 | 4+ beds | 7,807 | 8,326 | AED 65M |
| May 2026 · 1 sale | ||||
| 14 May 2026 | 4+ beds | 6,493 | 7,540 | AED 48.96M |
| Dec 2025 · 1 sale | ||||
| 23 Dec 2025 | 4+ beds | 11,927 | 9,684 | AED 115.5M |
| Nov 2025 · 2 sales | ||||
| 14 Nov 2025 | 4+ beds | 25,536 | 7,951 | AED 203.03M |
| 4 Nov 2025 | 4+ beds | 12,019 | 8,062 | AED 96.9M |
Homes
29 homes by size
- 4 beds48%14 homes · 6,328–8,698 sq ft · 10 layouts
- 5 beds41%12 homes · 11,378–19,035 sq ft · 6 layouts
- 6 beds7%2 homes · 18,183–25,536 sq ft · 2 layouts
- 7 beds3%1 home · 47,726 sq ft · 1 layout
Location
Drive times
- Downtown Dubai17min
- Dubai Airport (DXB)27min
- Dubai Marina31min
By car. La Mer Beach, the nearest beach, is 1.1 km away.
Rated schools
- JSS Private SchoolIndian · Very good4.2 kmaway
- New Academy SchoolAmerican · Good4.4 kmaway
Getting around
- Al Satwa RoadGold Line · opens 20322.4 kmaway
- Financial CentreRed Line3.5 kmaway
- Al JaddafHigh-speed rail · planned8.7 kmaway
- MeydanEtihad Rail · planned9.7 kmaway
- Dubai InternationalDXB12 kmaway
Area guideLa MerFinished homesAED 3,002/sq ft1-bed rentAED 105k/yrGross yieldEstimate4.4%Developer
- 29 finished
- 34 being built, on time
- 2 past their planned date
- 1 not started
- Escrow bank
- Abu Dhabi Commercial Bank
- Legal name
- Dhre 2 Bts L.L.C
Also being built by Meraas
| Project | Handover | Built |
|---|---|---|
| Nad Al Sheba Gardens Phase 3Meydan | Q2 2026Past planned date | 97% |
| Central Park PlazaAl Wasl | Q4 2026Past planned date | 44% |
| ElaraUmm Suqeim 3 | Q4 2026Being built | 78% |
| Design QuarterZaa'Beel Second | Q1 2027Being built | 41% |
| Bluewaters BayDubai Marina | Q1 2027Being built | 37% |
More questions about Jumeirah Asora Bay
Q1 2029, the planned date in DLD’s register.
It is not past its planned date. It was 4% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 2 years.
29 homes on 10 floors: 14 4+ bed flats of 6,328–8,698 sq ft, 12 4+ bed flats of 11,378–19,035 sq ft, 2 4+ bed flats of 18,183–25,536 sq ft and 1 4+ bed of 47,726 sq ft.
About AED 500k a year for a 4+ bed in La Mer, a gross yield of about 4.4% Estimate.
Of Meraas’ 66 projects on DLD’s record, 29 are finished. Of the 36 being built, 2 are past their planned date.
In La Mer, 17 minutes by car to Downtown Dubai and 27 to Dubai Airport (DXB). Financial Centre Metro station on the Red Line is 3.5 km away.
