Skip to content

Jumeirah Residences Emirates Towers

Trade CentreMeraas

FromAED 4.29M1 bed · 880 sq ft

Jumeirah Residences Emirates Towers is an off-plan project by Meraas in Trade Centre, with 754 homes on 57 floors. DLD’s last inspection, on 26 Oct 2026, found it 4% built.

Built
4%
Handover
Q3 2030
Since launch
Up 5%1 bed price per sq ft
Homes
754

Progress

4%built
  1. Aug–Oct 2025Launch sales · 661
  2. Q3 2025Building started
  3. Oct 2026Last inspection · 4%
  4. Q3 2030Planned handover

Prices

Price per sq ft

5,248 AED/sq ft88 sales in 12 months

Typical price by size

1 bed
AED 4.29M880 sq ft · 16 sales
2 beds
AED 6.65M1,166 sq ft · 37 sales
3 beds
AED 10.79M1,930 sq ft · 35 sales

Latest sales

Plus 1 newer sale, newest first
88 off-plan sales · Nov 2025 – Oct 2026, plus 1 newer sale · newest first
DateSizeSq ftAED/sq ftPrice
Nov 2026
17 Nov 20261 bed New8905,057AED 4.5M
Oct 2026 · 1 sale
21 Oct 20263 beds1,9305,402AED 10.43M
Aug 2026 · 1 sale
17 Aug 20263 beds1,9265,613AED 10.81M
Jul 2026 · 1 sale
17 Jul 20261 bed8904,582AED 4.08M
Apr 2026 · 2 sales
27 Apr 20263 beds2,5648,114AED 20.8M
7 Apr 20263 beds1,9305,613AED 10.83M
Mar 2026 · 4 sales
31 Mar 20263 beds1,9305,590AED 10.79M
6 Mar 20262 beds1,5324,424AED 6.78M
5 Mar 20263 beds1,9265,600AED 10.79M
4 Mar 20261 bed8905,056AED 4.5M
Feb 2026 · 7 sales
23 Feb 20263 beds1,9265,530AED 10.65M
19 Feb 20263 beds1,9305,566AED 10.74M
5 Feb 20263 beds2,5658,295AED 21.28M
5 Feb 20262 beds1,1655,706AED 6.65M
5 Feb 20263 beds1,9305,589AED 10.79M
5 Feb 20263 beds1,9305,543AED 10.7M
2 Feb 20263 beds1,9355,520AED 10.68M
Jan 2026 · 25 sales
27 Jan 20262 beds1,1614,880AED 5.67M
26 Jan 20261 bed8804,833AED 4.25M
26 Jan 20262 beds1,3735,114AED 7.02M
26 Jan 20262 beds1,1615,234AED 6.08M
26 Jan 20263 beds1,9265,553AED 10.7M
26 Jan 20262 beds1,3735,242AED 7.2M
26 Jan 20263 beds1,9265,552AED 10.69M
23 Jan 20263 beds2,1147,675AED 16.22M
13 Jan 20262 beds1,5904,514AED 7.18M
13 Jan 20263 beds1,9305,566AED 10.74M
13 Jan 20262 beds1,5904,762AED 7.57M
8 Jan 20262 beds1,1655,022AED 5.85M
8 Jan 20262 beds1,1655,388AED 6.28M
8 Jan 20263 beds2,1147,439AED 15.73M
7 Jan 20263 beds1,9265,423AED 10.44M
7 Jan 20261 bed8804,986AED 4.39M
7 Jan 20261 bed8634,849AED 4.19M
7 Jan 20261 bed8805,255AED 4.62M
7 Jan 20263 beds1,9265,576AED 10.74M
7 Jan 20263 beds2,1147,525AED 15.91M
7 Jan 20263 beds1,9265,423AED 10.45M
7 Jan 20263 beds2,1147,016AED 14.83M
7 Jan 20263 beds2,1147,177AED 15.17M
7 Jan 20263 beds1,9265,623AED 10.83M
6 Jan 20261 bed8904,799AED 4.27M
Dec 2025 · 16 sales
23 Dec 20253 beds1,9265,576AED 10.74M
16 Dec 20251 bed8804,925AED 4.33M
16 Dec 20253 beds2,1146,821AED 14.42M
16 Dec 20253 beds1,9265,357AED 10.32M
16 Dec 20252 beds1,1655,322AED 6.2M
16 Dec 20252 beds1,1654,961AED 5.78M
16 Dec 20251 bed8634,789AED 4.13M
15 Dec 20252 beds1,4844,727AED 7.02M

Homes

754 homes by size

  • 1 bed33%250 homes · 862–890 sq ft · 3 layouts
  • 2 beds52%392 homes · 1,115–1,590 sq ft · 6 layouts
  • 3 beds14%104 homes · 1,926–2,557 sq ft · 4 layouts
  • 4 beds1%8 homes · 3,472–6,369 sq ft · 2 layouts

Golden Visa

10-year residence for owners of homes worth AED 2M or moreOff-plan homes can qualify.
Qualifying homes fromAED 4.29M

Location

Drive times

  • Downtown Dubai14min
  • Dubai Airport (DXB)23min
  • Dubai Marina27min

By car. La Mer Beach, the nearest beach, is 3.1 km away.

Rated schools

  • New Academy SchoolAmerican · Good3.7 kmaway
  • JSS Private SchoolIndian · Very good4.3 kmaway

Getting around

  • Emirates TowersRed Line9 minwalk
  • Al Satwa RoadGold Line · opens 203227 minwalk
  • Al JaddafHigh-speed rail · planned5.0 kmaway
  • MeydanEtihad Rail · planned6.8 kmaway
  • Dubai InternationalDXB8.9 kmaway
Area guideTrade CentreFinished homesNot enough sales1-bed rentAED 85k/yr

Developer

  • 29 finished
  • 34 being built, on time
  • 2 past their planned date
  • 1 not started
Escrow bank
Mashreq Bank
Legal name
Dhre 2 Bts L.L.C

Also being built by Meraas

Meraas’ other projects
ProjectHandoverBuilt
Nad Al Sheba Gardens Phase 3MeydanQ2 2026Past planned date97%
Central Park PlazaAl WaslQ4 2026Past planned date44%
ElaraUmm Suqeim 3Q4 2026Being built78%
Design QuarterZaa'Beel SecondQ1 2027Being built41%
Bluewaters BayDubai MarinaQ1 2027Being built37%
All 66 Meraas projects
Questions

More questions about Jumeirah Residences Emirates Towers

From AED 4.29M for a 880 sq ft 1-bed, the lowest typical price paid in the 12 months. 2-bed flats sell for about AED 6.65M and 3-bed flats sell for about AED 10.79M.

Q3 2030, the planned date in DLD’s register.

It is not past its planned date. It was 4% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 4 years.

754 homes on 57 floors: 250 1-bed flats of 862–890 sq ft, 392 2-bed flats of 1,115–1,590 sq ft, 104 3-bed flats of 1,926–2,557 sq ft and 8 4+ bed flats of 3,472–6,369 sq ft.

Up 5% for 1-bed flats, per sq ft. Against the launch sales of Aug 2025 – Oct 2025: 2-bed flats up 4%, 3-bed flats down 7%.

About AED 85k a year for a 1-bed, AED 109k for a 2-bed, AED 140k for a 3-bed and AED 305k for a 4+ bed in Trade Centre.

Of Meraas’ 66 projects on DLD’s record, 29 are finished. Of the 36 being built, 2 are past their planned date.

Homes worth AED 2M or more can qualify for 10 years’ residence. Here, qualifying homes start from AED 4.29M.

In Trade Centre, 14 minutes by car to Downtown Dubai and 23 to Dubai Airport (DXB). Emirates Towers Metro station on the Red Line is a 9-minute walk.

More nearby

How the numbers work

FromAED 4.29MSee it on the map