Skip to content

Sobha Orbis

Motor CitySobha

FromAED 1.22M1 bed · 630 sq ft

Sobha Orbis is an off-plan project by Sobha in Motor City, with 2,964 homes on 46 floors. DLD’s last inspection, on 26 Oct 2026, found it 18% built.

Built
18%
Handover
Q4 2028
Since launch
Up 3%1 bed price per sq ft
Homes
2,964

About

Seven buildings in Motor City with 1-bed, 1.5-bed and 2-bed flats, close to Al Khail Road, the Dubai Autodrome and First Avenue Mall. The buildings are set among landscaped gardens. Residents share a large pool with a lazy river, a gym, a clubhouse and yoga areas.

  • Seven buildings in Motor City
  • Large pool with a lazy river
  • 1-bed to 2-bed flats

Shared facilities

  • Large pool
  • Lazy river
  • Jacuzzis
  • Yoga areas
  • Shaded cabanas
  • Gym
  • Clubhouse
  • Landscaped gardens

Progress

18%built
  1. Q2 2024Building started
  2. Aug–Oct 2024Launch sales · 982
  3. Oct 2026Last inspection · 18%
  4. Q4 2028Planned handover

Prices

Price per sq ft

1,979 AED/sq ft171 sales in 12 months

Typical price by size

1 bed
AED 1.22M630 sq ft · 118 sales
2 beds
AED 2.06M1,004 sq ft · 53 sales

Against 10 Motor City off-plan projects with 10 or more sales

  • Lowest1,322AED/sq ft
  • Typical1,823AED/sq ft
  • Sobha Orbis1,979AED/sq ft
  • Highest2,044AED/sq ft

3rd highest of 10 · AED per sq ft in 12 months

Latest sales

Plus 2 newer sales, newest first
171 off-plan sales · Nov 2025 – Oct 2026, plus 2 newer sales · newest first
DateSizeSq ftAED/sq ftPrice
Nov 2026
12 Nov 20262 beds New9902,200AED 2.18M
11 Nov 20261 bed New5481,880AED 1.03M
Oct 2026 · 4 sales
20 Oct 20261 bed6251,920AED 1.2M
15 Oct 20261 bed6511,844AED 1.2M
7 Oct 20261 bed5411,880AED 1.02M
5 Oct 20261 bed5461,921AED 1.05M
Sep 2026 · 5 sales
28 Sep 20261 bed5461,906AED 1.04M
22 Sep 20262 beds9922,201AED 2.18M
17 Sep 20261 bed6161,799AED 1.11M
17 Sep 20261 bed5451,894AED 1.03M
9 Sep 20261 bed7322,251AED 1.65M
Aug 2026 · 3 sales
31 Aug 20261 bed5461,879AED 1.03M
13 Aug 20261 bed5451,832AED 999k
5 Aug 20261 bed5451,835AED 1M
Jul 2026 · 6 sales
29 Jul 20261 bed6732,102AED 1.41M
28 Jul 20261 bed6331,844AED 1.17M
27 Jul 20261 bed6352,179AED 1.38M
13 Jul 20262 beds9922,201AED 2.18M
10 Jul 20261 bed5461,879AED 1.03M
1 Jul 20261 bed8302,146AED 1.78M
Jun 2026 · 2 sales
25 Jun 20262 beds1,0042,049AED 2.06M
9 Jun 20261 bed5361,824AED 977k
May 2026 · 5 sales
20 May 20261 bed5452,080AED 1.13M
19 May 20261 bed6161,870AED 1.15M
11 May 20261 bed5461,667AED 910k
7 May 20262 beds9892,050AED 2.03M
7 May 20262 beds1,0032,050AED 2.06M
Apr 2026 · 4 sales
14 Apr 20262 beds9942,200AED 2.19M
13 Apr 20262 beds9922,201AED 2.18M
9 Apr 20261 bed6341,921AED 1.22M
9 Apr 20262 beds1,0551,949AED 2.06M
Mar 2026 · 3 sales
17 Mar 20262 beds9941,965AED 1.95M
17 Mar 20262 beds9902,200AED 2.18M
9 Mar 20262 beds9922,201AED 2.18M
Feb 2026 · 9 sales
23 Feb 20261 bed5461,954AED 1.07M
23 Feb 20262 beds1,0032,050AED 2.06M
23 Feb 20262 beds9912,051AED 2.03M
19 Feb 20261 bed5461,829AED 999k
18 Feb 20262 beds1,0082,081AED 2.1M
16 Feb 20261 bed5801,911AED 1.11M
10 Feb 20261 bed6711,895AED 1.27M
6 Feb 20261 bed6972,075AED 1.45M
5 Feb 20261 bed5381,889AED 1.02M
Jan 2026 · 15 sales
29 Jan 20261 bed6352,079AED 1.32M
29 Jan 20261 bed6401,994AED 1.28M
28 Jan 20261 bed8302,131AED 1.77M
26 Jan 20261 bed5461,944AED 1.06M
22 Jan 20261 bed6301,929AED 1.22M
22 Jan 20261 bed6401,870AED 1.2M
21 Jan 20262 beds1,0032,050AED 2.06M

Homes

2,964 homes by size

  • 1 bed89%2,637 homes · 536–925 sq ft · 25 layouts
  • 2 beds11%327 homes · 992–1,252 sq ft · 6 layouts

Golden Visa

10-year residence for owners of homes worth AED 2M or moreOff-plan homes can qualify.
Qualifying homes fromAED 2.04M

Location

Drive times

  • Downtown Dubai27min
  • Dubai Airport (DXB)33min
  • Dubai Marina24min

By car. JBR Beach, the nearest beach, is 12.3 km away.

Rated schools

  • Safa Community SchoolUK · Outstanding1.4 kmaway
  • Dwight SchoolInternational Baccalaureate · Good2.6 kmaway

Getting around

  • Dubai Miracle GardenGold Line · opens 203220 minwalk
  • Al YalayisEtihad Rail8.9 kmaway
  • Jumeirah Golf EstatesRed Line9.3 kmaway
  • Al Maktoum AirportHigh-speed rail · planned19 kmaway
  • Al Maktoum InternationalDWC19 kmaway
Area guideMotor CityFinished homesAED 1,000/sq ft1-bed rentAED 73k/yrGross yieldEstimate7.6%

Developer

  • 20 finished
  • 24 being built, on time
  • 1 not started
Escrow bank
Dubai Islamic Bank
Legal name
Sobha L.L.C

Also being built by Sobha

Sobha’s other projects
ProjectHandoverBuilt
Verde by SobhaJLTQ2 2027Being built85%
Sobha EstatesBu KadraQ4 2027Being built68%
Sobha Seahaven Tower ADubai MarinaQ2 2028Being built37%
Elwood EstatesThe ValleyQ2 2028Being built14%
Sobha Seahaven Tower B & CDubai MarinaQ4 2028Being built40%
All 45 Sobha projects
Questions

More questions about Sobha Orbis

From AED 1.22M for a 630 sq ft 1-bed, the lowest typical price paid in the 12 months. 2-bed flats sell for about AED 2.06M.

Q4 2028, the planned date in DLD’s register.

It is not past its planned date. It was 18% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 2 years.

2,964 homes on 46 floors: 2,637 1-bed flats of 536–925 sq ft and 327 2-bed flats of 992–1,252 sq ft.

Up 3% for 1-bed flats, per sq ft. Against the launch sales of Aug 2024 – Oct 2024: 2-bed flats up 3%.

About AED 73k a year for a 1-bed and AED 118k for a 2-bed in Motor City, a gross yield of about 7.6% Estimate.

Of Sobha’s 45 projects on DLD’s record, 20 are finished. Of the 24 being built, none is past its planned date.

Homes worth AED 2M or more can qualify for 10 years’ residence. Here, qualifying homes start from AED 2.04M.

In Motor City, 27 minutes by car to Downtown Dubai and 33 to Dubai Airport (DXB). Jumeirah Golf Estates Metro station on the Red Line is 9.3 km away.

More nearby

How the numbers work

FromAED 1.22MSee it on the map