Skip to content

The Hillgate

Silicon OasisEllington

FromAED 749kStudio · 419 sq ft

The Hillgate is an off-plan project by Ellington in Silicon Oasis, with 356 homes on 16 floors. DLD’s last inspection, on 26 Oct 2026, found it 3% built.

Built
3%
Handover
Q2 2028
Since launch
Up 1%Studio price per sq ft
Homes
356

Progress

3%built
  1. Q1 2025Building started
  2. Aug–Oct 2025Launch sales · 129
  3. Oct 2026Last inspection · 3%
  4. Q2 2028Planned handover

Prices

Price per sq ft

1,636 AED/sq ft203 sales in 12 months

Typical price by size

Studio
AED 749k419 sq ft · 1,743 AED/sq ft · 11 sales
1 bed
AED 1.27M779 sq ft · 1,632 AED/sq ft · 87 sales
2 beds
AED 2.04M1,246 sq ft · 1,635 AED/sq ft · 99 sales
3 beds
AED 2.72M1,661 sq ft · 1,639 AED/sq ft · 5 sales
4+ beds
Not enough sales1 sale

Against 9 Silicon Oasis off-plan projects with 10 or more sales

  • Lowest1,011AED/sq ft
  • Typical1,340AED/sq ft
  • The Hillgate1,636AED/sq ft
  • Highest2,004AED/sq ft

4th highest of 9 · AED per sq ft in 12 months

Latest sales

Plus 2 newer sales, newest first
203 off-plan sales · Nov 2025 – Oct 2026, plus 2 newer sales · newest first
DateSizeSq ftAED/sq ftPrice
Nov 2026
19 Nov 20262 beds New1,1971,682AED 2.01M
2 Nov 20261 bed New7741,814AED 1.4M
Oct 2026 · 7 sales
20 Oct 2026Studio4801,925AED 924k
19 Oct 20261 bed7761,685AED 1.31M
19 Oct 20262 beds1,2461,555AED 1.94M
8 Oct 20262 beds1,2481,647AED 2.06M
5 Oct 20262 beds1,1971,688AED 2.02M
1 Oct 20262 beds1,2461,695AED 2.11M
1 Oct 20261 bed7841,891AED 1.48M
Sep 2026 · 9 sales
30 Sep 20262 beds1,1971,672AED 2M
28 Sep 20261 bed7791,740AED 1.36M
28 Sep 20261 bed7761,894AED 1.47M
21 Sep 20261 bed7791,669AED 1.3M
15 Sep 20261 bed7791,782AED 1.39M
15 Sep 20261 bed7741,899AED 1.47M
14 Sep 20261 bed7791,629AED 1.27M
10 Sep 20262 beds1,3141,916AED 2.52M
7 Sep 20261 bed7791,645AED 1.28M
Aug 2026 · 2 sales
13 Aug 20262 beds1,2461,779AED 2.22M
6 Aug 20262 beds1,1971,753AED 2.1M
Jul 2026 · 26 sales
30 Jul 20261 bed7791,613AED 1.26M
27 Jul 20262 beds1,3181,547AED 2.04M
27 Jul 20262 beds1,2491,540AED 1.92M
27 Jul 20261 bed7871,636AED 1.29M
27 Jul 20262 beds1,1971,543AED 1.85M
27 Jul 20262 beds1,2461,542AED 1.92M
27 Jul 20262 beds1,3281,622AED 2.15M
27 Jul 20262 beds1,1971,541AED 1.84M
27 Jul 20261 bed7791,566AED 1.22M
27 Jul 20262 beds1,1971,541AED 1.84M
27 Jul 20261 bed7821,565AED 1.22M
27 Jul 20261 bed7791,634AED 1.27M
27 Jul 20262 beds1,2591,613AED 2.03M
22 Jul 20262 beds1,2461,641AED 2.04M
20 Jul 20262 beds1,1971,649AED 1.97M
20 Jul 20261 bed7791,603AED 1.25M
16 Jul 20261 bed7761,591AED 1.23M
15 Jul 20262 beds1,1971,601AED 1.92M
14 Jul 20262 beds1,1971,517AED 1.82M
10 Jul 20261 bed7781,900AED 1.48M
10 Jul 20261 bed7791,613AED 1.26M
10 Jul 20261 bed7821,672AED 1.31M
10 Jul 20262 beds1,1971,728AED 2.07M
6 Jul 20262 beds1,1971,554AED 1.86M
6 Jul 20262 beds1,2461,688AED 2.1M
6 Jul 20261 bed7791,656AED 1.29M
Jun 2026 · 5 sales
19 Jun 20261 bed7791,580AED 1.23M
9 Jun 20261 bed7791,645AED 1.28M
9 Jun 20262 beds1,1971,682AED 2.01M
9 Jun 20261 bed7791,684AED 1.31M

Homes

356 homes by size

  • Studio7%25 homes · 417–480 sq ft · 2 layouts
  • 1 bed47%169 homes · 779–782 sq ft · 2 layouts
  • 2 beds39%139 homes · 1,197–1,397 sq ft · 7 layouts
  • 3 beds6%22 homes · 1,643–3,066 sq ft · 4 layouts
  • 4 beds1 home · 2,757 sq ft · 1 layout

Golden Visa

10-year residence for owners of homes worth AED 2M or moreOff-plan homes can qualify.
Qualifying homes fromAED 2.08M

Location

Drive times

  • Downtown Dubai30min
  • Dubai Airport (DXB)30min
  • Dubai Marina38min

By car. Mercato Beach, the nearest beach, is 17.9 km away.

Rated schools

  • GEMS Wellington Academy -FzeUK · Very good0.8 kmaway
  • Repton SchoolUK/IB (Y 13) · Outstanding3.8 kmaway

Getting around

  • Dubai Silicon OasisBlue Line · opens 202919 minwalk
  • MeydanEtihad Rail · planned9.6 kmaway
  • CreekGreen Line13 kmaway
  • Al JaddafHigh-speed rail · planned14 kmaway
  • Dubai InternationalDXB16 kmaway
Area guideSilicon OasisFinished homesAED 1,189/sq ft1-bed rentAED 60k/yrGross yieldEstimate6.5%

Developer

  • 18 finished
  • 25 being built, on time
  • 7 past their planned date
  • 1 not started
Escrow bank
First Abu Dhabi Bank
Legal name
Ellington Properties Development L.L.C

Also being built by Ellington

Ellington’s other projects
ProjectHandoverBuilt
The PortmanJVCQ3 2025Past planned date79%
UH West BY EllingtonJLTQ1 2026Past planned date71%
UH East BY EllingtonJLTQ1 2026Past planned date47%
The QuaysideBusiness BayQ1 2026Past planned date55%
The Waterside Villas BY EllingtonMajanQ2 2026Past planned date32%
All 51 Ellington projects
Questions

More questions about The Hillgate

From AED 749k for a 419 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 1.27M, 2-bed flats sell for about AED 2.04M and 3-bed flats sell for about AED 2.72M.

Q2 2028, the planned date in DLD’s register.

It is not past its planned date. It was 3% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 19 months.

356 homes on 16 floors: 25 studios of 417–480 sq ft, 169 1-bed flats of 779–782 sq ft, 139 2-bed flats of 1,197–1,397 sq ft, 22 3-bed flats of 1,643–3,066 sq ft and 1 4+ bed of 2,757 sq ft.

Up 1% for 1-bed flats, per sq ft. Against the launch sales of Aug 2025 – Oct 2025: studios up 1%, 2-bed flats up 2%, 3-bed flats up 5%.

About AED 43k a year for a studio, AED 60k for a 1-bed, AED 85k for a 2-bed and AED 120k for a 3-bed in Silicon Oasis, a gross yield of about 6.5% Estimate.

Of Ellington’s 51 projects on DLD’s record, 18 are finished. Of the 32 being built, 7 are past their planned date.

Homes worth AED 2M or more can qualify for 10 years’ residence. Here, qualifying homes start from AED 2.08M.

In Silicon Oasis, 30 minutes by car to Downtown Dubai and 30 to Dubai Airport (DXB). Creek Metro station on the Green Line is 13 km away.

More nearby

How the numbers work

FromAED 749kSee it on the map