Skip to content

City Walk Crestlane 2

City WalkMeraas

City Walk Crestlane 2 is an off-plan project by Meraas in City Walk, with 201 homes on 12 floors. DLD’s last inspection, on 26 Oct 2026, found it 7% built.

Built
7%
Handover
Q4 2028
Sales in 12 months
2
Homes
201

Progress

7%built
  1. Mar–May 2025Launch sales · 198
  2. Q2 2025Building started
  3. Oct 2026Last inspection · 7%
  4. Q4 2028Planned handover

Prices

Price per sq ft

Not enough sales

Typical price by size

1 bed
Not enough sales1 sale
4+ beds
Not enough sales1 sale

Against 9 Al Wasl off-plan projects with 10 or more sales

  • Lowest2,232AED/sq ft
  • Typical3,410AED/sq ft
  • City Walk Crestlane 23,603AED/sq ft
  • Highest4,443AED/sq ft

Latest sales

Plus 1 newer sale, newest first
2 off-plan sales · Nov 2025 – Oct 2026, plus 1 newer sale · newest first
DateSizeSq ftAED/sq ftPrice
Nov 2026
11 Nov 20262 beds New1,4943,078AED 4.6M
Oct 2026 · 1 sale
23 Oct 20261 bed7933,623AED 2.87M
Sep 2026 · 1 sale
28 Sep 20264+ beds4,5893,583AED 16.44M

Homes

201 homes by size

  • 1 bed41%83 homes · 788–818 sq ft · 3 layouts
  • 2 beds38%76 homes · 1,185–1,494 sq ft · 7 layouts
  • 3 beds17%34 homes · 1,766–4,582 sq ft · 9 layouts
  • 4 beds4%8 homes · 4,588–4,986 sq ft · 4 layouts

Location

Drive times

  • Downtown Dubai11min
  • Dubai Airport (DXB)25min
  • Dubai Marina25min

By car. Mercato Beach, the nearest beach, is 1.5 km away.

Rated schools

  • JSS Private SchoolIndian · Very good1.6 kmaway
  • Jumeirah English Speaking SchoolUK · Outstanding3.2 kmaway

Getting around

  • City WalkGold Line · opens 20328 minwalk
  • Burj Khalifa / Dubai MallRed Line21 minwalk
  • MeydanEtihad Rail · planned7.0 kmaway
  • Al JaddafHigh-speed rail · planned8.0 kmaway
  • Dubai InternationalDXB12 kmaway
Area guideAl WaslFinished homesAED 2,850/sq ft1-bed rentAED 135k/yrGross yieldEstimate5.1%

Developer

  • 29 finished
  • 34 being built, on time
  • 2 past their planned date
  • 1 not started
Escrow bank
Abu Dhabi Commercial Bank
Legal name
Citywalk Residential 1 L.L.C

Also being built by Meraas

Meraas’ other projects
ProjectHandoverBuilt
Nad Al Sheba Gardens Phase 3MeydanQ2 2026Past planned date97%
Central Park PlazaAl WaslQ4 2026Past planned date44%
ElaraUmm Suqeim 3Q4 2026Being built78%
Design QuarterZaa'Beel SecondQ1 2027Being built41%
Bluewaters BayDubai MarinaQ1 2027Being built37%
All 66 Meraas projects
Questions

More questions about City Walk Crestlane 2

Q4 2028, the planned date in DLD’s register.

It is not past its planned date. It was 7% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 2 years.

201 homes on 12 floors: 83 1-bed flats of 788–818 sq ft, 76 2-bed flats of 1,185–1,494 sq ft, 34 3-bed flats of 1,766–4,582 sq ft and 8 4+ bed flats of 4,588–4,986 sq ft.

About AED 135k a year for a 1-bed, AED 218k for a 2-bed, AED 320k for a 3-bed and AED 482k for a 4+ bed in Al Wasl, a gross yield of about 5.1% Estimate.

Of Meraas’ 66 projects on DLD’s record, 29 are finished. Of the 36 being built, 2 are past their planned date.

In City Walk, Al Wasl, 11 minutes by car to Downtown Dubai and 25 to Dubai Airport (DXB). Burj Khalifa / Dubai Mall Metro station on the Red Line is a 21-minute walk.

More nearby

How the numbers work