Skip to content

City Walk Northline 1

City WalkMeraas

FromAED 2.17M1 bed · 801 sq ft

City Walk Northline 1 is an off-plan project by Meraas in City Walk, with 114 homes on 8 floors. DLD’s last inspection, on 26 Oct 2026, found it 38% built.

Built
38%
Handover
Not on record
Since launch
Up 2%1 bed price per sq ft
Homes
114

Progress

38%built
  1. Apr–Jun 2024Launch sales · 103
  2. Q3 2024Building started
  3. Oct 2026Last inspection · 38%

Prices

Price per sq ft

Not enough sales

Typical price by size

1 bed
AED 2.17M801 sq ft · 2,716 AED/sq ft · 3 sales
2 beds
Not enough sales1 sale

Against 9 Al Wasl off-plan projects with 10 or more sales

  • Lowest2,232AED/sq ft
  • City Walk Northline 12,715AED/sq ft
  • Typical3,410AED/sq ft
  • Highest4,443AED/sq ft

Latest sales

Newest first
5 off-plan sales · Nov 2025 – Oct 2026 · newest first
DateSizeSq ftAED/sq ftPrice
Oct 2026 · 1 sale
2 Oct 20262 beds1,2483,197AED 3.99M
Jun 2026 · 1 sale
3 Jun 20261 bed8012,683AED 2.15M
Mar 2026 · 1 sale
4 Mar 20262 beds1,1792,646AED 3.12M
Nov 2025 · 2 sales
19 Nov 20251 bed8262,715AED 2.24M
5 Nov 20251 bed7812,778AED 2.17M

Homes

114 homes by size

  • 1 bed49%56 homes · 708–934 sq ft · 8 layouts
  • 2 beds40%46 homes · 1,179–1,941 sq ft · 14 layouts
  • 3 beds11%12 homes · 1,808–3,957 sq ft · 6 layouts

Location

Drive times

  • Downtown Dubai11min
  • Dubai Airport (DXB)25min
  • Dubai Marina25min

By car. Mercato Beach, the nearest beach, is 1.6 km away.

Rated schools

  • JSS Private SchoolIndian · Very good1.8 kmaway
  • Jumeirah English Speaking SchoolUK · Outstanding3.4 kmaway

Getting around

  • City WalkGold Line · opens 20324 minwalk
  • Burj Khalifa / Dubai MallRed Line19 minwalk
  • MeydanEtihad Rail · planned7.0 kmaway
  • Al JaddafHigh-speed rail · planned7.7 kmaway
  • Dubai InternationalDXB12 kmaway
Area guideAl WaslFinished homesAED 2,850/sq ft1-bed rentAED 135k/yrGross yieldEstimate5.1%

Developer

  • 29 finished
  • 34 being built, on time
  • 2 past their planned date
  • 1 not started
Escrow bank
First Abu Dhabi Bank
Legal name
Citywalk Residential 1 L.L.C

Also being built by Meraas

Meraas’ other projects
ProjectHandoverBuilt
Nad Al Sheba Gardens Phase 3MeydanQ2 2026Past planned date97%
Central Park PlazaAl WaslQ4 2026Past planned date44%
ElaraUmm Suqeim 3Q4 2026Being built78%
Design QuarterZaa'Beel SecondQ1 2027Being built41%
Bluewaters BayDubai MarinaQ1 2027Being built37%
All 66 Meraas projects
Questions

More questions about City Walk Northline 1

From AED 2.17M for a 801 sq ft 1-bed, the lowest typical price paid in the 12 months.

114 homes on 8 floors: 56 1-bed flats of 708–934 sq ft, 46 2-bed flats of 1,179–1,941 sq ft and 12 3-bed flats of 1,808–3,957 sq ft.

Up 2% for 1-bed flats, per sq ft.

About AED 135k a year for a 1-bed, AED 218k for a 2-bed and AED 320k for a 3-bed in Al Wasl, a gross yield of about 5.1% Estimate.

Of Meraas’ 66 projects on DLD’s record, 29 are finished. Of the 36 being built, 2 are past their planned date.

In City Walk, Al Wasl, 11 minutes by car to Downtown Dubai and 25 to Dubai Airport (DXB). Burj Khalifa / Dubai Mall Metro station on the Red Line is a 19-minute walk.

More nearby

How the numbers work

FromAED 2.17MSee it on the map