Skip to content

City Walk Crestlane 3

City WalkMeraas

FromAED 2.63M1 bed · 789 sq ft

City Walk Crestlane 3 is an off-plan project by Meraas in City Walk, with 193 homes on 11 floors. DLD’s last inspection, on 26 Oct 2026, found it 5% built.

Built
5%
Handover
Q4 2028
Since launch
No change1 bed price per sq ft
Homes
193

Progress

5%built
  1. Mar–May 2025Launch sales · 188
  2. Q2 2025Building started
  3. Oct 2026Last inspection · 5%
  4. Q4 2028Planned handover

Prices

Price per sq ft

3,258 AED/sq ft4 sales in 12 months

Typical price by size

1 bed
AED 2.63M789 sq ft · 3,260 AED/sq ft · 3 sales
3 beds
Not enough sales1 sale

Against 9 Al Wasl off-plan projects with 10 or more sales

  • Lowest2,232AED/sq ft
  • City Walk Crestlane 33,258AED/sq ft
  • Typical3,410AED/sq ft
  • Highest4,443AED/sq ft

Latest sales

Newest first
4 off-plan sales · Nov 2025 – Oct 2026 · newest first
DateSizeSq ftAED/sq ftPrice
Jul 2026 · 3 sales
30 Jul 20261 bed8073,258AED 2.63M
22 Jul 20261 bed7883,383AED 2.67M
3 Jul 20263 beds3,4512,943AED 10.16M
Feb 2026 · 1 sale
18 Feb 20261 bed7893,257AED 2.57M

Homes

193 homes by size

  • 1 bed41%79 homes · 772–815 sq ft · 4 layouts
  • 2 beds37%72 homes · 1,169–1,493 sq ft · 9 layouts
  • 3 beds18%34 homes · 1,747–4,420 sq ft · 10 layouts
  • 4 beds4%8 homes · 4,588–4,986 sq ft · 4 layouts

Location

Drive times

  • Downtown Dubai11min
  • Dubai Airport (DXB)25min
  • Dubai Marina25min

By car. Mercato Beach, the nearest beach, is 1.4 km away.

Rated schools

  • JSS Private SchoolIndian · Very good1.6 kmaway
  • Jumeirah English Speaking SchoolUK · Outstanding3.2 kmaway

Getting around

  • City WalkGold Line · opens 203210 minwalk
  • Burj Khalifa / Dubai MallRed Line23 minwalk
  • MeydanEtihad Rail · planned7.2 kmaway
  • Al JaddafHigh-speed rail · planned8.1 kmaway
  • Dubai InternationalDXB12 kmaway
Area guideAl WaslFinished homesAED 2,850/sq ft1-bed rentAED 135k/yrGross yieldEstimate5.1%

Developer

  • 29 finished
  • 34 being built, on time
  • 2 past their planned date
  • 1 not started
Escrow bank
Abu Dhabi Commercial Bank
Legal name
Citywalk Residential 1 L.L.C

Also being built by Meraas

Meraas’ other projects
ProjectHandoverBuilt
Nad Al Sheba Gardens Phase 3MeydanQ2 2026Past planned date97%
Central Park PlazaAl WaslQ4 2026Past planned date44%
ElaraUmm Suqeim 3Q4 2026Being built78%
Design QuarterZaa'Beel SecondQ1 2027Being built41%
Bluewaters BayDubai MarinaQ1 2027Being built37%
All 66 Meraas projects
Questions

More questions about City Walk Crestlane 3

From AED 2.63M for a 789 sq ft 1-bed, the lowest typical price paid in the 12 months.

Q4 2028, the planned date in DLD’s register.

It is not past its planned date. It was 5% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 2 years.

193 homes on 11 floors: 79 1-bed flats of 772–815 sq ft, 72 2-bed flats of 1,169–1,493 sq ft, 34 3-bed flats of 1,747–4,420 sq ft and 8 4+ bed flats of 4,588–4,986 sq ft.

0% for 1-bed flats, per sq ft.

About AED 135k a year for a 1-bed, AED 218k for a 2-bed, AED 320k for a 3-bed and AED 482k for a 4+ bed in Al Wasl, a gross yield of about 5.1% Estimate.

Of Meraas’ 66 projects on DLD’s record, 29 are finished. Of the 36 being built, 2 are past their planned date.

In City Walk, Al Wasl, 11 minutes by car to Downtown Dubai and 25 to Dubai Airport (DXB). Burj Khalifa / Dubai Mall Metro station on the Red Line is a 23-minute walk.

More nearby

How the numbers work

FromAED 2.63MSee it on the map