Skip to content

South Square

Dubai SouthDubai South

FromAED 1.22M1 bed · 801 sq ft

South Square is an off-plan project by Dubai South in Dubai South, with 553 homes on 14 floors. DLD’s last inspection, on 26 Oct 2026, found it 3% built.

Built
3%
Handover
Q2 2028
Since launch
Up 5%1 bed price per sq ft
Homes
553

Progress

3%built
  1. Aug–Oct 2025Launch sales · 202
  2. Q4 2025Building started
  3. Oct 2026Last inspection · 3%
  4. Q2 2028Planned handover

Prices

Price per sq ft

1,472 AED/sq ft226 sales in 12 months

Typical price by size

1 bed
AED 1.22M801 sq ft · 84 sales
2 beds
AED 1.95M1,292 sq ft · 84 sales
3 beds
AED 2.42M1,673 sq ft · 58 sales

Against 66 Dubai South off-plan projects with 10 or more sales

  • Lowest750AED/sq ft
  • South Square1,472AED/sq ft
  • Typical1,580AED/sq ft
  • Highest2,550AED/sq ft

29th lowest of 66 · AED per sq ft in 12 months

Latest sales

Plus 2 newer sales, newest first
226 off-plan sales · Nov 2025 – Oct 2026, plus 2 newer sales · newest first
DateSizeSq ftAED/sq ftPrice
Nov 2026
20 Nov 20262 beds New1,2301,618AED 1.99M
6 Nov 20263 beds New2,3291,138AED 2.65M
Sep 2026 · 13 sales
25 Sep 20261 bed7641,440AED 1.1M
16 Sep 20262 beds1,2921,587AED 2.05M
15 Sep 20263 beds1,5901,509AED 2.4M
15 Sep 20263 beds1,6971,532AED 2.6M
14 Sep 20261 bed8441,688AED 1.43M
14 Sep 20262 beds1,2291,790AED 2.2M
14 Sep 20263 beds1,5901,478AED 2.35M
14 Sep 20261 bed8441,659AED 1.4M
14 Sep 20262 beds1,1101,802AED 2M
14 Sep 20263 beds1,6971,385AED 2.35M
14 Sep 20261 bed7641,656AED 1.27M
10 Sep 20263 beds1,6731,536AED 2.57M
3 Sep 20261 bed8881,689AED 1.5M
Aug 2026 · 4 sales
27 Aug 20263 beds1,6731,464AED 2.45M
17 Aug 20262 beds1,2301,748AED 2.15M
5 Aug 20262 beds1,1101,802AED 2M
4 Aug 20262 beds1,2921,645AED 2.13M
Jul 2026 · 4 sales
31 Jul 20262 beds1,2921,482AED 1.92M
8 Jul 20262 beds1,3801,380AED 1.9M
1 Jul 20262 beds1,2791,458AED 1.87M
1 Jul 20262 beds1,5241,330AED 2.03M
Jun 2026 · 7 sales
25 Jun 20262 beds1,1101,820AED 2.02M
18 Jun 20263 beds1,5781,553AED 2.45M
17 Jun 20262 beds1,3801,315AED 1.82M
11 Jun 20261 bed8491,649AED 1.4M
10 Jun 20261 bed8881,633AED 1.45M
9 Jun 20261 bed8081,528AED 1.24M
4 Jun 20261 bed7601,553AED 1.18M
May 2026 · 13 sales
21 May 20262 beds1,3811,441AED 1.99M
20 May 20262 beds1,4211,232AED 1.75M
14 May 20263 beds1,5781,568AED 2.48M
14 May 20262 beds1,2331,513AED 1.87M
13 May 20263 beds1,7991,329AED 2.39M
13 May 20261 bed7761,418AED 1.1M
12 May 20261 bed7601,441AED 1.1M
11 May 20262 beds1,1101,712AED 1.9M
4 May 20261 bed7641,597AED 1.22M
4 May 20263 beds1,6731,380AED 2.31M
1 May 20261 bed8011,429AED 1.15M
1 May 20263 beds1,5781,648AED 2.6M
1 May 20261 bed8441,440AED 1.22M
Apr 2026 · 75 sales
30 Apr 20261 bed8001,425AED 1.14M
27 Apr 20261 bed8441,481AED 1.25M
23 Apr 20263 beds1,7991,375AED 2.47M
23 Apr 20261 bed8011,523AED 1.22M
23 Apr 20261 bed8001,525AED 1.22M
23 Apr 20263 beds2,4621,158AED 2.85M
22 Apr 20262 beds1,3811,380AED 1.91M

Homes

553 homes by size

  • 1 bed40%220 homes · 760–1,077 sq ft · 11 layouts
  • 2 beds40%219 homes · 1,110–2,190 sq ft · 17 layouts
  • 3 beds21%114 homes · 1,578–2,739 sq ft · 14 layouts

Golden Visa

10-year residence for owners of homes worth AED 2M or moreOff-plan homes can qualify.
Qualifying homes fromAED 2.05M

Location

Drive times

  • Downtown Dubai39min
  • Dubai Airport (DXB)44min
  • Dubai Marina28min

By car. Jebel Ali Beach, the nearest beach, is 11.8 km away.

Rated schools

No rated schools within 5 km

Getting around

  • Al Maktoum AirportHigh-speed rail · planned5.8 kmaway
  • Al Maktoum InternationalDWC5.8 kmaway
  • Expo 2020Red Line6.6 kmaway
  • Al YalayisEtihad Rail13 kmaway
Area guideDubai SouthFinished homesAED 1,100/sq ft1-bed rentAED 57k/yrGross yieldEstimate7.4%

Developer

  • 13 finished
  • 15 being built, on time
  • 3 past their planned date
Escrow bank
Commercial Bank of Dubai
Legal name
Dubai South Properties Dwc LLC

Also being built by Dubai South

Dubai South’s other projects
ProjectHandoverBuilt
South LivingDubai SouthQ1 2020Past planned date89%
South Bay 1Dubai SouthQ1 2025Past planned date94%
South Bay 2Dubai SouthQ2 2026Past planned date94%
Beachfront Gates 1Dubai SouthQ4 2026Being built36%
Beachfront Gates 2Dubai SouthQ4 2026Being built61%
All 31 Dubai South projects
Questions

More questions about South Square

From AED 1.22M for a 801 sq ft 1-bed, the lowest typical price paid in the 12 months. 2-bed flats sell for about AED 1.95M and 3-bed flats sell for about AED 2.42M.

Q2 2028, the planned date in DLD’s register.

It is not past its planned date. It was 3% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 19 months.

553 homes on 14 floors: 220 1-bed flats of 760–1,077 sq ft, 219 2-bed flats of 1,110–2,190 sq ft and 114 3-bed flats of 1,578–2,739 sq ft.

Up 5% for 1-bed flats, per sq ft. Against the launch sales of Aug 2025 – Oct 2025: 2-bed flats down 4%, 3-bed flats up 1%.

About AED 57k a year for a 1-bed, AED 85k for a 2-bed and AED 120k for a 3-bed in Dubai South, a gross yield of about 7.4% Estimate.

Of Dubai South’s 31 projects on DLD’s record, 13 are finished. Of the 18 being built, 3 are past their planned date.

Homes worth AED 2M or more can qualify for 10 years’ residence. Here, qualifying homes start from AED 2.05M.

In Dubai South, 39 minutes by car to Downtown Dubai and 44 to Dubai Airport (DXB). Expo 2020 Metro station on the Red Line is 6.6 km away.

More nearby

How the numbers work

FromAED 1.22MSee it on the map